5.1 Costs Included: For the purposes of 11B-202.4, the adjusted construction cost for a project shall include: • All direct or "hard" costs directly associated with the contractor’s construction...
Search Results "Future Construction Theaters"
Commonly Searched Documents
-
5.1 Costs Included
-
Triggering event. (Section-by-Section Analysis)
In the NPRM, the Department proposed using the start of physical construction as the triggering event for applying the proposed standards to new construction under title III....
-
Triggering event
In Sec. 35.151(c)(2) of the NPRM, the Department proposed that the commencement of construction serve as the triggering event for applying the proposed standards to new construction and...
-
11B-234.1 General
These requirements apply generally to newly designed and constructed amusement rides and attractions....
-
§ 35.151(a)(1)
(1) Each facility or part of a facility constructed by, on behalf of, or for the use of a public entity shall be designed and constructed in such manner that the facility or part of the...
-
§ 35.151(a)(1)
(1) Each facility or part of a facility constructed by, on behalf of, or for the use of a public entity shall be designed and constructed in such manner that the facility or part of the...
-
Practice Putting Greens, Practice Teeing Grounds, and Teeing Stations at Driving Ranges: ADA Standard Section 238.3
Section 238.3 covers scoping requirements in the ADA Standards for practice putting greens, practice teeing grounds, and teeing stations at driving ranges.
-
11B-238.3 Practice putting greens, practice teeing grounds, and teeing stations at driving ranges
At least 5 percent, but no fewer than one, of practice putting greens, practice teeing grounds, and teeing stations at driving ranges shall be designed and constructed so that a golf car...
-
11B-245.2 Application
residence, that portion used exclusively in the operation of the public accommodation or that portion used both for the public accommodation and for residential purposes is covered by the new construction...
-
11B-703.1.1 Plan review and inspection
Signs as specified in Section 11B-703, or in other sections of this code, when included in the construction of new buildings or facilities, or when included, altered or replaced due to additions...
-
Organization of This Rule
As noted above, the 2004 ADAAG, taken together with the requirements contained in subpart D of 28 CFR part 36 (New Construction and Alterations) of the final rule, will be referred to as...
-
IV. Eligibility for Goods and Services
For example, excluding individuals with cerebral palsy from a movie theater or restricting individuals with Down's Syndrome to only certain areas of a restaurant would violate the regulation...
-
1.1.3.2, Item 14.1
Theater, dancehall, skating rink, auditorium, assembly hall, meeting hall, nightclub, fair building or similar place of assemblage where 50 or more persons may gather together in a building...
-
Additions [4.1.5]
To the extent that a space or element is newly constructed as part of an addition, it is also regarded as new construction and must comply with the applicable new construction provisions...
- Mohawk Group Chilled Check Carpet Tiles
-
Subpart F-Certification of State Laws or Local Building Codes (Section-by-Section Analysis)
Once the proposed standards take effect, certifications issued under the 1991 Standards would not have any future effect, and states and local jurisdictions with codes certified under the...
-
Enactment of the ADA and Issuance of the 1991 Regulations
The ADA also requires newly designed and constructed or altered State and local government facilities, public accommodations, and commercial facilities to be readily accessible to and usable...
- SafePath: Threshold Ramp Installation for MultiFamily Housing for Disability Access
-
Uniform Federal Accessibility Standards (UFAS)
This document presents uniform standards for the design, construction and alteration of buildings so that physically handicapped persons will have ready access to and use of them in accordance...
-
§8.3 Replacement cost of the completed facility
Replacement cost of the completed facility means the current cost of construction and equipment for a newly constructed housing facility of the size and type being altered....
-
APPROVED
[DSA-AC] “Approved” means meeting the approval of the enforcing agency, except as otherwise provided by law, when used in connection with any system, material, type of construction, fixture...
- KirbyBuilt Providence Picnic Table with Maximum Seating
-
704.2.3 Combustible projections
Combustible projections located where openings are not permitted or where protection of openings is required shall be of at least 1-hour fire-resistance-rated construction, Type IV construction...
-
§100.205(b)
Example (2): A real estate developer plans to construct a building consisting of 10 units of multifamily housing on a waterfront site that floods frequently....