accommodation that permits the use of an other power-driven mobility device by an individual with a mobility disability shall accept the presentation of a valid, State-issued disability parking...
Search Results "Parking Slope"
-
§ 36.311(c)(2) Inquiry into use of other power-driven mobility device
-
5.1 Q...Would the first story of single-story dwelling units over the parking level be required to be accessible?
A. Yes. The Guidelines adopt and amplify the definition of ground floor found in HUD's regulation implementing the Fair Housing Act (see 24 CFR 100.201) to indicate that . . .where...
-
206 and Chapter 4 Accessible Routes
[See subsections ...]
- The Challenges EV Charging for People with Disabilities
-
What occupancies are or are not subject to path of travel and/or accessible routes? …buildings subject to California Building Code (CBC) Chapter 11B? …multi-family buildings subject to CBC Chapter 11A? …others?
In addition, an accessible path of travel is required where EVCS are installed at existing facilities where vehicle fueling, recharging, parking or storage is a primary function....
-
1(2)(a)(ii) Site analysis test
entrance served by an accessible route can be established by the following steps: (A) The percentage of the total buildable area of the undisturbed site with a natural grade less than 10% slope...
-
Swimming pools. (Section-by-Section Analysis)
have over 300 linear feet of swimming pool wall and are not being altered will be required to provide only one (rather than two) accessible means of entry, at least one of which must be a sloped...
-
Scoping [4.1.2(1), 4.1.3(1)] and Location [4.3.2]
Clear width, surface texture, running and cross slope, and the treatment of changes in level help determine the usability of walking surfaces by people with mobility impairments....
-
11B-305.2 Floor or ground surfaces
Changes in level, slopes exceeding 1:48, and detectable warnings shall not be permitted. Exception: Reserved....
-
11B-1002.2 Accessible routes
In load or unload areas and on amusement rides, where compliance with Section 11B-405.2 _|Slope|_ is not structurally or operationally feasible, ramp slope shall be permitted to be 1:8 maximum...
-
11B-1002.2 Accessible routes
In load or unload areas and on amusement rides, where compliance with Section 11B-405.2 _|Slope|_ is not structurally or operationally feasible, ramp slope shall be permitted to be 1:8 maximum...
-
1002.2 Accessible Routes
In load or unload areas and on amusement rides, where compliance with 405.2 is not structurally or operationally feasible, ramp slope shall be permitted to be 1:8 maximum. 2....
-
1002.2 Accessible Routes
In load or unload areas and on amusement rides, where compliance with 405.2 is not structurally or operationally feasible, ramp slope shall be permitted to be 1:8 maximum. 2....
-
1002.2 Accessible Routes
In load or unload areas and on amusement rides, where compliance with 405.2 is not structurally or operationally feasible, ramp slope shall be permitted to be 1:8 maximum. 2....
- Spectrum Aquatics Access Ramp
-
1(2)(a)(i) Individual building test
It is impractical to provide an accessible entrance served by an accessible route when the terrain of the site is such that: (A) the slopes of the undisturbed site measured between the...
-
1017.4 Passing Spaces
Where passing spaces and resting intervals overlap, the technical requirements for resting intervals in 1017.8.3 require the slope of the surface to not be steeper than 1:48 in any direction...
-
11B-1002.2 Accessible routes
Exceptions: In load or unload areas and on amusement rides, where compliance with Section 11B-405.2 is not structurally or operationally feasible, ramp slope shall be permitted...
-
Significant alternatives which minimize any significant economic impacts on small entities
Maximum cross slope of 2 percent required on pedestrian access routes, including within pedestrian street crossings with yield or stop control....
-
Vertical Clearance [4.6.5]
Vertical clearance of at least 98 inches is based on the height necessary for personally-owned vans. (A higher clearance (114 inches) is required for passenger loading zones to...
-
1012 Parking Spaces within Camping Units and Picnic Units and Pull-Up Spaces at Dump Stations
[See subsections ...]
-
1012 Parking Spaces Within Camping Units and Picnic Units and Pull-Up Spaces at Dump Stations
[See subsections ...]
-
11.1 Q. Under the individual building test, how is the second step of the test performed, which involves measuring the slope of the finished grade between the entrance and applicable arrival points?
The slope is measured at ground level from the entrance to the top of the pavement of all vehicular and pedestrian arrival points within 50 feet of the planned entrance, or, if there are...
-
Toilet Buildings and Pit Toilets
Whether the pit toilet has walls or not, make sure the slope of the turning space and the clear floor or ground space does not exceed 1:48 (2 percent) in any direction....
