Parking lots, play areas, patios, constructed trails, man-made outdoor areas are often not considered to be buildings. Rather, these elements are generally considered to be facilities....
Search Results "Completion of Construction"
Commonly Searched Documents
-
BUILDING
-
Chapter 6 Addendum: Title II Checklist (Curb Ramps and Pedestrian Crossings)
A list of the pedestrian crossings constructed by or on behalf of your entity since January 26, 1992....
-
11B-504.5 Nosings
Exception: In existing buildings there is no requirement to retroactively alter existing nosing projections of 1½ inches (38 mm) which were constructed in compliance with the building code...
-
§ 36.303(g)(7)(ii)
digital movies after December 2, 2016, then that auditorium must comply with the requirements in paragraph (g) of this section by December 2, 2018, or within 6 months of that auditorium's complete...
-
Sec. 469.106(a)
(a) Notwithstanding any other provision of this chapter, the commission shall require complete compliance with the standards and specifications adopted by the commission under this chapter...
-
Audio description of exhibits
The Museum will continue to offer its existing twenty-minute tactile orientation tour with advance notice pending completion of its plan to provide a qualified audio describer who can audio...
-
§ 36.303(g)(7)(ii)
digital movies after December 2, 2016, then that auditorium must comply with the requirements in paragraph (g) of this section by December 2, 2018, or within 6 months of that auditorium's complete...
-
A4.2.3 WHEELCHAIR TURNING SPACE
A2 will allow most wheelchair users to complete U-turns without difficulty....
-
§382.157(d)
All fields in the form must be completed; carriers are to enter “0” where there were no complaints in a given category....
-
Selection of Methodology
A repeated survey measurements method was chosen by which survey respondents would initially complete survey questions within eight research sections: SECTION #1 Geographic, demographic...
-
When is a historic structure considered accessible?
Construction was completed. The program is considered accessible, although the building is not....
-
ADA Task Force Meeting Topics (Public Entity)
Click here to view or download the PDF version of "ADA Task Force Meeting Topics" (12 KB PDF)] Role of ADA Compliance Coordinator Maintain Accountability within Task Force for Completion...
-
DETR
The method of data collection was designed to be completed in a very short participation time....
-
4.1.1(3) Areas Used Only by Employees as Work Areas
Areas that are used only as work areas shall be designed and constructed so that individuals with disabilities can approach, enter, and exit the areas....
-
11B-233.3.4.3 Alterations to residential dwelling units with adaptable features
The building standards for residential dwelling units with adaptable features do not apply to the alteration, repair, rehabilitation or maintenance of residential dwelling units constructed...
-
"Existing Facility" (Section-by-Section Analysis)
Newly constructed or altered facilities are also existing facilities....
-
1.9.1.4 Enforcing agency
State-funded tenant improvements to State-leased facilities, the local jurisdiction must be aware of DGS’ jurisdictional authority and DSA’s jurisdictional approvals necessary for State-funded construction...
-
Standards Development
At the first meeting, they decided to table our proposals until the current work was completed....
-
§382.143(b)
You must ensure that personnel required to receive training complete the training by the following times:...
- American Standard Colony PRO Two-Handle Kitchen Faucet with High-Arc Swivel Spout 7074.550
-
Picnic Unit
An outdoor space within a picnic area or facility that is designed and constructed for picnicking and that contains one or more constructed features such as picnic tables, grills, and other...
-
H.3 - If an agency began work on EIT prior to June 21, 2001 that will be developed entirely in-house, but won't be completed until after June 21, 2001, does this EIT have to meet the 508 requirements?
Yes. The Access Board's standards for EIT became effective February 20, 2001 and apply to EIT that is developed, procured, maintained or used by the Federal government, whether...
-
Background
during construction and at completion....
-
Sec. 469.102(c)
(c) The owner of the building or facility may not allow an application to be filed with a local governmental entity for a building construction permit related to the plans and specifications...