Except for one, the maneuvering experiments were completed within simulated environments built with plywood floors and wood framed dividers faced with fiberboard and covered with construction...
Search Results "Completion of Construction"
Commonly Searched Documents
-
UDI
-
24. TRAINING FOR OWNED HOTELS, MANAGED HOTELS, AND JOINT VENTURE HOTELS
Consent Decree, all employees working at Owned Hotels, Managed Hotels, and Joint Venture Hotels whose essential job functions require them to interact with hotel guests shall be required to complete...
-
68.74. Continuing Education
(c) The continuing education hours must have been completed within the term of the current registration, in the case of a timely renewal....
-
§1191.1(a)
The Department of Justice adopted the 2010 ADA Standards for Accessible Design (2010 Standards) as the regulatory standards for the new construction and alteration of facilities subject...
-
POWER-ASSISTED DOOR
If the switch or door is released, such doors immediately begin to close or close completely within 3 to 30 seconds (see automatic door)....
-
II-5.2000 Methods for providing program accessibility
In many situations, providing access to facilities through structural methods, such as alteration of existing facilities and acquisition or construction of additional facilities, may be...
-
c) Changes
Since many building projects require more than one year to complete, it is not unusual for the pertinent Building Code requirements to change during construction. ...
-
Changes
Since many building projects require more than one year to complete, it is not unusual for the pertinent Building Code requirements to change during construction. ...
-
Exhibition label text
The Museum will continue to offer its existing twenty-minute tactile orientation tour with advance notice pending completion of its plan to provide a qualified reader who can read labels...
- SafePath: Threshold Ramp Installation for MultiFamily Housing for Disability Access
-
704.2.3 Combustible projections
Combustible projections located where openings are not permitted or where protection of openings is required shall be of at least 1-hour fire-resistance-rated construction, Type IV construction...
-
Transition Plans
In the early 1990s, the Forest Service called for all units to complete transition plans identifying the changes needed to make each facility accessible and the timeline for completing those...
-
3.3.14 Grip Strength
3.3.14 Grip Strength There were large differences in the percentage of individuals capable of completing the gripping tasks and, for those able to complete the tasks, the distribution...
-
Uniform Federal Accessibility Standards (UFAS)
This document presents uniform standards for the design, construction and alteration of buildings so that physically handicapped persons will have ready access to and use of them in accordance...
-
APPROVED
[DSA-AC] “Approved” means meeting the approval of the enforcing agency, except as otherwise provided by law, when used in connection with any system, material, type of construction, fixture...
-
§382.127(e)
(e) You must not disconnect the battery on wheelchairs or other mobility devices equipped with a non-spillable battery completely enclosed within a case or compartment integral to the design...
-
§100.205(b)
Example (2): A real estate developer plans to construct a building consisting of 10 units of multifamily housing on a waterfront site that floods frequently....
-
"Existing Facility" (Section-by-Section Analysis)
Newly constructed or altered facilities are also existing facilities....
-
2. DESIGN PROFESSIONAL IN GENERAL RESPONSIBLE CHARGE STATMENT
sheet delineating the Path of Travel (POT) for a project shall include the following statement: "Design Professional in General Responsible Charge Statement: The POT identified in these construction...
-
Amusement rides. (Section-by-Section Analysis)
Section 234 of the 2010 Standards provides accessibility guidelines for newly designed and constructed amusement rides....
-
§8.56(h)(1)
(1) A complainant or recipient may request that a complete review be made of the letter of findings within 30 days of receipt, by mailing or delivering to the reviewing civil rights official...
-
4.1.1(4) Temporary Structures
Temporary buildings and facilities are not of permanent construction but are extensively used or are essential for public use for a period of time....