Where new trailhead information signs are provided at trailheads on newly constructed or altered trails, they shall comply with 7.4.11....
Search Results "Pervious Construction"
Commonly Searched Documents
-
7.4.11 Trailhead Signs
-
6.14 Gates and Barriers
Where gates or barriers are constructed to control access to beach access routes, gates and barriers shall comply with 6.14....
-
III-7.4100 General
This section addresses exterior features such as parking, portable toilets, and exterior signage in new construction....
-
Condition, Manner, or Duration
terms ‘‘condition’’ ‘‘manner,’’ or ‘‘duration’’ should at all times take into account the principles in § 35.108(d)(1) and § 36.105(d)(1), respectively, which referred to the rules of construction...
-
ADMINISTRATIVE AUTHORITY
[DSA-AC] A governmental agency that adopts or enforces regulations and guidelines for the design, construction, or alteration of buildings and facilities....
-
Section 2. Finished grade
"Finished grade" means the ground surface of the site after all construction, levelling, grading, and development has been completed....
-
4.3.11.1(4)
(4) A vestibule located immediately adjacent to an exit enclosure and constructed to the same fire-resistive standards as required for corridors and openings....
-
§100.205(e)(2)
(2) The following also qualify as HUD-recognized safe harbors for compliance with the Fair Housing Act design and construction requirements:...
-
13.14 Post-1993 Franchised Hotel
13.14 “Post-1993 Franchised Hotel” means a Franchised Hotel constructed for first occupancy after January 26, 1993....
-
13.17 Post-1993 Owned Hotel
13.17 “Post-1993 Owned Hotel” means an Owned Hotel constructed for first occupancy after January 26, 1993....
-
13.16 Post-1993 Managed Hotel
13.16 “Post-1993 Managed Hotel” means a Managed Hotel constructed for first occupancy after January 26, 1993....
-
§ 35.151(c)(4)
(4) For the purposes of this section, ceremonial groundbreaking or razing of structures prior to site preparation do not commence physical construction or alterations....
-
State and Local Government Facilities: Guidance on the Revisions to 28 CFR Section 35.151
State and Local Government Facilities: Guidance on the Revisions to 28 CFR Section 35.151 Section 35.151(a), which provided that those facilities that are constructed or altered by, on...
-
2.4
respect to any of Cinemark's Existing Theaters, any of Cinemark's Modified Theaters that are modified in accordance with this Consent Order, and any of Cinemark's Designed Theaters or Future Construction...
-
EXHIBIT C Certification of ADA Compliance
I, [insert name], in my capacity as a Licensed Architect or Construction/Project Manager acting on behalf of QuikTrip Corporation pursuant to a certain Consent Decree executed by the parties...
-
203.1 General
ETA Editor’s Note 35.151(a)(2) New Construction and Alterations; Design and Construction; Exception for Structural Impracticability 36.401(c) New Construction; Exception for Structural...
-
11B-224.8.2 More than 50-bed facilities
ETA Editor's Note The following Access Board Note was taken from ADA Title II §35.151(e) New Construction and Alterations; Social Service Center Establishments, and ADA Title III §36.406...
-
11B-202.3.2 Extent of application
An alteration of an existing element, space, or area of a building or facility shall not impose a requirement for accessibility greater than required for new construction. ...
-
238.2.2 Putting Greens
Putting greens shall be designed and constructed so that a golf car can enter and exit the putting green....
-
202.3.2 Extent of Application
An alteration of an existing element, space, or area of a building or facility shall not impose a requirement for accessibility greater than required for new construction....
-
§ 35.151(i)(2)
(2) Newly constructed or altered street level pedestrian walkways must contain curb ramps at intersections to streets, roads, or highways....
-
§ 36.406(a)(4)
(4) For the purposes of this section, "start of physical construction or alterations" does not mean ceremonial groundbreaking or razing of structures prior to site preparation....
-
Scoping
Scoping—Specifications of where, when, and how much of constructed features detailed in the technical requirements must be met in order to be in compliance with the guidelines....
-
R202.2 Added Elements
Where elements are added to existing facilities, the added elements shall comply with the applicable requirements for new construction....