Constructed elements on beach access routes and resting intervals shall comply with 307. Advisory 1018.9 Protruding Objects....
Search Results "Commencement of Construction"
-
1018.9 Protruding Objects
-
1018.9 Protruding Objects
This section requires constructed elements on beach access routes and resting intervals to comply with the technical requirements for protruding objects in 307 of the Architectural Barriers...
-
1017.9 Protruding Objects
Constructed elements on trails, passing spaces, and resting intervals shall comply with 307. Advisory 1017.9 Protruding Objects....
-
Additions [§202.2]
or extend a facility’s gross floor area or height of a facility are considered additions (as defined in §106.5) and must comply with the requirements of the standards applicable to new construction...
-
§ 38.71(b)(1)
(1) Vehicles intended to be operated solely in light rail systems confined entirely to a dedicated right-of-way, and for which all stations or stops are designed and constructed for revenue...
-
7.4.11.2 Sign Contents
Where new trail information signs are provided at trailheads on newly constructed or altered trails, regardless of whether the trail is accessible, the signs shall include at minimum the...
-
Clear Width: ADA Standard Section 403.5.1
Section 403.5.1 covers the current ADA Standards for the clear width of walking surfaces that are part of an accessible route.
-
Reporting
Ninety (90) days following the commencement of the fall 2013 quarter, the University’s ADA Coordinator shall submit a report to the Department confirming its implementation of the policies...
-
A. BACKGROUND
The investigation was commenced when the Department received a complaint dated August 14, 2004, from Mr....
-
Civil Lawsuits
In any action or administrative proceeding commenced pursuant to the Act or this part, the court or agency, in its discretion, may allow the prevailing party, other than the United States...
-
F. Publicity
Commencing within ten (10) days from execution of this Settlement Agreement, and continuing as long as its Entertainment Operations take place in Joe Louis Arena, Olympia shall publicize...
-
4.3 Periodic Reviews.
)(v) requires airports to establish a system for periodically reviewing and updating the self-evaluation required by paragraph (c)(2) of that Section. 28 CFR § 35.151 requires that new construction...
-
Cross Slope [1016.7.2]
When the surface is constructed of concrete, asphalt, or boards, the cross slope must be no steeper than 1:48 (2 percent)....
-
§ 382.61 Training
established under § 382.63, within 180 days of that date; (iii) For crewmembers subject to training requirements under 14 CFR part 121 or 135 whose employment in any given position commences...
-
A. The Release Provisions Appear To Waive Access Claims Arising After The Date Of The Settlement Agreements
authority to conduct compliance reviews of entities covered by Title III, investigate alleged violations – sometimes based upon individual complaints -- and, when necessary and appropriate, commence...
-
1630.1(c)
(c) Construction. --...
-
Areas for further work
Of course, it was not expected that all of these would be included in any one industry's standards, but they do indicate the range and complexity of issues related to construction tolerances...
-
Industry Standards
ACI 117-2010 Standard Specifications for Tolerances for Concrete Construction and Materials ASTM E 380 Standard Practice for the Use of the International...
-
206.4.1 Public Entrances
Barriers at common or emergency entrances and exits of business establishments conducting business with the general public that are existing, under construction, or under contract for construction...
-
15(f)
(f) If, after January 26, 1993, HWI constructed an addition (as defined in ADA Standards § 3.4) to an Owned Hotel or Joint Venture Hotel that was originally constructed for first occupancy...
-
Play Tables: ADA Standard Section 1008.4.3
EXCEPTION: Play tables designed and constructed primarily for children 5 years and younger shall not be required to provide knee clearance where the clear floor or ground space required...
-
101.2 Scope
The provisions of this code shall apply to the construction, alteration, relocation, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal and demolition...
-
1.1.5 Referenced codes
When this code does not specifically cover any subject related to building design and construction, recognized architectural or engineering practices shall be employed....
-
[A] STRUCTURE
That which is built or constructed....