Eco-Grip Flooring Subfloor Preparation
Search Results "Ramp Surface"
Commonly Searched Documents
- Eco-Grip Flooring Video 1 of 8 Welcome and Subfloor Preparation
- Eco-Grip Flooring Video 2 of 8 Eco Grip Flooring Layout
- Eco-Grip Flooring Video 7 of 8 Drain Detail and Base Trim
-
What is the minimum level of slip resistance required by the standards?
The standards require ground and floor surfaces to be slip resistant, but they do not specify a minimum level of slip resistance or coefficient of friction. ...
-
Cross Slope [1017.7.2]
Some cross slope is necessary to provide drainage and to keep water from ponding and damaging the trail surface, especially on unpaved or natural surfaces....
-
Implications
surface. ...
-
R407.6.4 Change in Direction
Ramps that change direction between runs at landings shall have a clear landing 1.5 m (5.0 ft) minimum by 1.5 m (5.0 ft) minimum....
-
Rotational Penetrometer
When the caster is released, the spring load gauge replicates the force of an individual in a wheelchair over a given surface....
-
1011.2.2 Surface
The surface of the clear ground space shall be firm and stable....
-
1011.2.2 Surface
The surface of the clear ground space shall be firm and stable....
-
Q3: Roadway Resurfacing Alteration Project and Curb Ramp Improvements
Q3: If a roadway resurfacing alteration project does not span the full width of the road, do I have to put in curb ramps?...
-
11B-1008.2.6.1 Accessibility
Ground surfaces shall comply with ASTM F 1951. Ground surfaces shall be inspected and maintained regularly and frequently to ensure continued compliance with ASTM F 1951....
-
11B-1008.2.6.1 Accessibility
Ground surfaces shall comply with ASTM F 1951. Ground surfaces shall be inspected and maintained regularly and frequently to ensure continued compliance with ASTM F 1951....
-
11B-1008.2.5.1 Ground level
Ramp runs connecting ground level play components shall have a running slope not steeper than 1:16....
-
1008.2.5.1 Ground Level
Ramp runs connecting ground level play components shall have a running slope not steeper than 1:16....
-
1008.2.5.1 Ground Level
Ramp runs connecting ground level play components shall have a running slope not steeper than 1:16....
-
11B-1008.2.5.1 Ground level
Ramp runs connecting ground level play components shall have a running slope not steeper than 1:16....
-
11B-1008.2.5.1 Ground level
Ramp runs connecting ground level play components shall have a running slope not steeper than 1:16....
-
405.2 Slope (Exception 2), 405.6 Rise (Exception)
The running slope of ramp runs must not be steeper than 1:12 and any ramp rise must be 30 inches maximum....
-
Roadway resurfacing, curb ramps at crosswalks
If roadways are being resurfaced or otherwise altered as part of a BRT project, curb ramps must be installed at crosswalks that have been affected. (DOT ADA Standard 106.5.)...
-
Openings [§302.3]
Openings [§302.3] Openings in ground and floor surfaces, such as grates, are limited in width to prevent passage of a ½” diameter sphere....
-
11B-504.4 Tread surface
Stair treads shall comply with Section 11B-302. Changes in level, slopes exceeding 1:48, and detectable warnings shall not be permitted. Exception: Reserved.
-
1008.2.5.1 Ground Level
Ramp runs connecting ground level play components shall have a running slope not steeper than 1:16....