The fact that a condominium unit is sold before the completion of construction does not exempt a developer from compliance with the Act's accessibility requirements....
Search Results "Completion of Construction"
-
Dwelling Unit
-
Q6: Curb Ramp Installation Work on Separate Contract
A6: The curb ramp installation work can be contracted separately, but the work must be coordinated such that the curb ramp work is completed prior to, or at the same time as, the completion...
- Moen M–Dura Chrome Two-Handle Utility Faucet 8119
- Moen M–Dura Chrome Two-Handle Utility Faucet 8121
-
Section 36.406(b) Application of Standards to Fixed Elements (Section-by-Section Analysis)
Once the construction or alteration of a facility has been completed, all other aspects of programs, services, and activities conducted in that facility are subject to the operational requirements...
-
409.1 General
Where transactional outputs are provided by ICT with speech output, the speech output shall audibly provide all information necessary to complete or verify a transaction....
-
11B-810.2.2 Dimensions
Access Board's Note to Reader: The Department of Transportation's ADA Standards indicate that compliance is required to the extent construction specifications are within a public entity's...
-
11B-810.2.2 Dimensions
Access Board's Note to Reader: The Department of Transportation's ADA Standards indicate that compliance is required to the extent construction specifications are within a public entity's...
-
Research Projects
A number of research projects have been completed by the Access Board and others are underway or planned....
-
Research Projects
A number of research projects have been completed by the Access Board and others are underway or planned....
-
Alterations [§202.3]
If a room or space is completely altered (or built new as part of an alteration), the entire room or space is fully subject to the standards....
-
PUBLIC BUILDING OR FACILITY
[DSA-AC] A building or facility or portion of a building or facility designed, constructed, or altered by, on behalf of, or for the use of a public entity subject to Chapter 1, Section 1.9.1.1...
-
PUBLIC BUILDING OR FACILITY
[DSA-AC] A building or facility or portion of a building or facility designed, constructed, or altered by, on behalf of, or for the use of a public entity subject to Chapter 1, Section 1.9.1.1...
-
C. REMEDIAL ACTION
Except where an earlier deadline is set forth in this Agreement, BIDMC shall complete all work required under this Agreement by five years from the effective date. 20....
-
Play Area
A portion of a site containing play components designed and constructed for children....
-
Re: Single User Restroom Accessibility
Section 11B-202.3.2 indicates that "an alteration of an existing element, space, or area of a building or facility shall not impose a requirement for accessibility greater than new construction...
-
7. Effect of Final Approval Order
Settlement Class members and, to the extent specifically set forth in this Settlement Agreement, upon Class Counsel, shall extinguish all Released Claims and shall constitute the final and complete...
-
Time Management
This limitation can affect their ability to complete tasks within a specified timeframe. It may also be difficult to prepare for, or to begin, work activities....
-
Multi-tasking
Create a flow-chart of tasks that must be performed at he same time Separate tasks so that each one can be completed one at a time Label or color-code each task in sequential or preferential...
-
Summary of the project
American Institute of Architects Construction Specifications Institute Master specification writing companies Other interested parties were also involved in the project...
-
11B-809.8.3.1 Floor or ground surface
Exterior landings of pervious construction (e.g., wood decking with spaces) shall be the same level as the interior landing, except that secondary exterior doors may have no more than 1/...
-
Research Projects
A number of research projects have been completed by the Access Board and others are underway or planned....
-
§ 37.59(b)
(b) Portions of the facility directly serving the rail system with the earlier completion date; and...