The ground level area beneath and immediately adjacent to a play structure or play equipment that is designated by ASTM F 1487 (incorporated by reference, see "Referenced Standards"...
Search Results "Material Cost"
Commonly Searched Documents
-
Use Zone
-
106.5.74 Use Zone
The ground level area beneath and immediately adjacent to a play structure or play equipment that is designated by ASTM F 1487 (incorporated by reference, see "Referenced Standards"...
-
4(6)
(6) At the primary entry door to dwelling units with direct exterior access, outside landing surfaces constructed of impervious materials such as concrete, brick or flagstone, are no more...
-
4.2.2. High Accessibility Baseline
The total costs over the 15-year analysis period under the High Accessibility baseline are $68.8 million when discounted at 7 percent, which is 22 percent lower than the total costs estimated...
-
3.6. Replacement Costs
The analysis estimates replacement costs for movie theaters purchasing new equipment as a direct result of the rulemaking. ...
-
4.2.1. Low Accessibility Baseline
For further detail, the annual costs by cost category for the Low Accessibility baseline are presented in Table 8-2 of Section 8.1 of the Appendices....
-
Resting Intervals [1018.8]
When the surface of the resting interval is constructed of materials other than asphalt, concrete, or boards, slopes no steeper than 1:20 (5 percent) are allowed when necessary for drainage...
-
4.2.3. Alternate Medium Accessibility Baseline
Audio Hardware Acquisition Costs $0.6 $0.5 17% Captioning Device Acquisition Costs $16.2...
-
Instrumentation for Analysis
Upon installation, the playground owner completed a questionnaire (Appendix B) on the type, size and intended age group of the playground, the total cost for the equipment, surface materials...
- TechniSoil G3® Pathway Liquid Polymer Stabilizer
- TechniSoil G3® Commercial Surface Liquid Polymer Stabilizer
-
Beach Access Routes
The entity is not required to expend more than 20 percent of the costs of constructing or altering facilities serving the beach or the beach nourishment project to provide beach access routes...
-
2.4.3. Maintenance and Administrative Costs
These costs include other potential costs not explicitly covered by the other cost components already included in the analysis (i.e., acquisition, installation, replacement, and training...
-
§ 36.403(f)(2)(iii)
(iii) Costs associated with providing accessible telephones, such as relocating the telephone to an accessible height, installing amplification devices, or installing a text telephone (TTY...
-
Sec.36.403(f)(2)(iii)
(iii) Costs associated with providing accessible telephones, such as relocating the telephone to an accessible height, installing amplification devices, or installing a telecommunications...
- Stabilizer Solutions Natural Decomposed Granite Pathway Stabilizer
-
3.2.2.4. Summary of Baselines
The primary analysis uses the Medium Accessibility baseline in the calculation of the estimated costs. ...
- Envirobond Organic-Lock™ Surface Stabilizer
-
3.7 Training Costs
Unlike the other costs in the analysis, the training costs also include the costs to movie theaters with auditoriums that were already equipped to provide closed movie captioning or audio...
-
6.2.4 Beach Nourishment
Exception: No more than 20 percent of the costs of a facility construction or alteration project or beach nourishment project shall be required to be expended to provide beach access routes...
-
II. Cost-disproportionality Is Only a Factor Under Certain Circumstances
The costs for those additional changes should not be ‘disproportionate.’ See 42 U.S.C. § 12147(a); 49 C.F.R. § 37.43(a)(2)....
-
ADA Facilities Compliance Continuing Education Courses & Resources
ADA Facilities Compliance Continuing Education Courses & Resources by Evan Terry Associates, P.C. Click here to view/download the pdf version (121 KB) Evan Terry...
-
2.4.2. Training Costs
includes the training costs for movie theaters already equipped to provide closed movie captioning and audio description....
-
3.5. Installation Costs
Although the Initial RA factored the relevant installation costs into the estimated device costs, the Final RA includes a separate estimation of installation costs. ...