(7) Construction Documents--Drawings, specifications, addenda, change orders, construction change directives and other supplemental documents prepared for the purpose of regulatory approval...
Search Results "Adjusted Construction Cost"
Commonly Searched Documents
-
68.10(7) Construction Documents
-
68.10(4) Commencement of Construction
(4) Commencement of Construction--The date of placement of engineering stakes, delivery of lumber or other construction materials to the job site, erection of batter boards, formwork, or...
-
8. New Construction and Alterations
New Construction and Alterations Otherwise, as previously agreed, new construction and alterations within the meaning of 28 C.F.R. § 35.151 will not count toward the $31 million, including...
-
68.10(6) Completion of Construction
(6) Completion of Construction--The date when a construction project results in occupancy or the issuance of a certificate of occupancy....
-
NEW CONSTRUCTION AND ALTERATIONS {35.151}
NEW CONSTRUCTION AND ALTERATIONS {35.151} New Construction Shall be designed and constructed to be readily accessible to and usable by individuals with disabilities...
-
2.2. Total Costs
The total costs quantified for the final rule are comprised of the following: Upfront Costs (One-time) Acquisition costs for captioning hardware for existing and new auditoriums...
-
6.3. Auditoriums Exhibiting Analog Movies
Cost Estimation The cost estimation for auditoriums exhibiting analog movies is presented in Table 6-7. ...
-
§104.39(b)
the provision of an appropriate education to handicapped persons than to nonhandicapped persons except to the extent that any additional charge is justified by a substantial increase in cost...
-
New Construction
New Construction ADA requirements for new construction have been in effect since January 1992....
-
§ 37.43(e)(2)(ii)
(ii) Costs associated with making restrooms accessible (e.g., grab bars, enlarged toilet stalls, accessible faucet controls);...
-
11B-101.1 General
[ADA Title II] §35.151(a) New construction and alterations; Design and construction....
-
4.2.4. Single-Auditorium Movie Theater Unit Costs Including Sony’s Technology
The cost per captioning device increases from $466 to $727 when including Sony’s technology in the average unit cost estimate....
-
3.4.2. Audio Description Hardware Unit Costs
Table 3-20 : Additional Cost for Audio Description Hardware Technology Cost Per Theater for Audio Description Hardware Doremi Captiview...
- Pressalit Care Nursing bench 2000, electrically height adjustable
-
3.4.4. Audio Description Device Unit Costs
The unit costs for all commercially-available audio description devices are presented in Table 3-22....
-
New Construction
New Construction The 2010 Standards, which set requirements for fixed elements and spaces, require that all new pool facilities built by State and local governments, public accommodations...
-
3.4.1. Captioning Hardware Unit Costs
Table 3-19 : Captioning Hardware Unit Costs Technology Cost Per Captioning Hardware Unit Doremi Captiview $864*...
-
New construction and alteration requirements
New construction and alteration requirements....
-
11B-203.2 Construction sites
Structures and sites directly associated with the actual processes of construction, including but not limited to, scaffolding, bridging, materials hoists, materials storage, and construction...
-
11B-203.2 Construction sites
Structures and sites directly associated with the actual processes of construction, including but not limited to, scaffolding, bridging, materials hoists, materials storage, and construction...
- Pressalit Care Adult changing table 3000, electrically height adjustable
-
3.4.3. Captioning Device Unit Costs
Table 3-21 : Captioning Device Unit Costs Technology Cost Per Captioning Device Doremi Captiview $453...
-
§ 36.406 Standards for new construction and alterations
§ 36.406 Standards for new construction and alterations....
-
Subpart D -- New Construction and Alterations
Subpart D -- New Construction and Alterations...