In alterations, full extensions of handrails shall not be required where such extensions would be hazardous due to plan configuration....
Search Results "Alteration Cost"
-
505.10 Handrail Extensions
-
505.10 Handrail Extensions
In alterations, full extensions of handrails shall not be required where such extensions would be hazardous due to plan configuration. ...
-
3. Primary Consideration: Who Chooses the Auxiliary Aid or Service?
followed if: the public entity can demonstrate that another equally effective means of communication is available; use of the means chosen would result in a fundamental alteration...
-
Historic Preservation [4.1.7]
Alterations to such facilities are required to be done in full compliance with the alteration requirements for other types of buildings....
-
Costs
Costs FEMA maintains a baseline target inventory of emergency transportable housing units ready to deploy in response to major disasters and emergencies based on historical usage, lead...
-
505.10 Handrail Extensions
In alterations, full extensions of handrails shall not be required where such extensions would be hazardous due to plan configuration....
-
F206.2.5 Restaurants and Cafeterias
In alterations, an accessible route shall not be required to existing raised or sunken dining areas, or to all parts of existing outdoor dining areas where the same services and decor are...
-
Sec.36.402(a) General
(a) General.
-
§27.3 Applicability.
[44 FR 31468, May 31, 1979, as amended at 56 FR 45621, Sept. 6, 1991; 68 FR 51390, Aug. 26, 2003; 80 FR 46513, Aug. 5, 2015]
-
§ 36.402(a) General.
(a) General.
-
4.1.6(3)(a) Ramps
(a) Ramps: Curb ramps and interior or exterior ramps to be constructed on sites or in existing buildings or facilities where space limitations prohibit the use of a 1:12 slope or...
-
4.1.6(3)(d)(i)
(i) Where it is technically infeasible to comply with clear opening width requirements of 4.13.5, a projection of 5/8 in maximum will be permitted for the latch side stop.
-
4.1.6(3)(a)(ii)
(ii) A slope between 1:8 and 1:10 is allowed for a maximum rise of 3 inches. A slope steeper than 1:8 is not allowed.
-
4.1.6(3)(a)(i)
(i) A slope between 1:10 and 1:12 is allowed for a maximum rise of 6 inches.
-
4.1.6(4)(a)
(a) Ramps. Curb ramps and ramps to be constructed on existing sites or in existing buildings or facilities may have slopes and rises as shown in Table 2 if space limitations prohibit...
-
Afternoon Session: Consulting with Private and Public Entities
Afternoon Session: Consulting with Private and Public Entities James L.E. Terry, AIA, CASp Evan Terry Associates © 2014 Evan Terry Associates, P.C. This...
-
F202.2.3 Toilet and Bathing Facilities
EXCEPTION: In alterations to areas serving additions where it is technically infeasible to comply with 603, altering existing toilet or bathing rooms is not required where a single unisex...
-
206.2.5 Restaurants and Cafeterias
In alterations, an accessible route shall not be required to existing raised or sunken dining areas, or to all parts of existing outdoor dining areas where the same services and decor are...
-
§ 35.130 General prohibitions against discrimination
procedures when the modifications are necessary to avoid discrimination on the basis of disability, unless the public entity can demonstrate that making the modifications would fundamentally alter...
-
4.17.3* Size and Arrangement
EXCEPTION: In instances of alteration work where provision of a standard stall (Fig. 30(a)) is technically infeasible or where plumbing code requirements prevent combining existing stalls...
-
4.1.6(4)(e)
Where alterations to existing facilities make strict compliance with 4.22 and 4.23 structurally impracticable, the addition of one "unisex" toilet per floor containing one water closet complying...
-
21. New construction
Paragraph (b) requires certain alterations to conform to the requirement of physical accessibility in paragraph (a)....
-
1.9.1.1.2
Leases per se, unless alterations occur, do not directly “trigger” construction code requirements....
-
1.9.1.1.2
Leases per se, unless alterations occur, do not directly “trigger” construction code requirements....