Bus stop boarding and alighting areas shall have a firm, stable surface.
Search Results "Teeing Ground"
-
810.2.1 Surface
-
810.2.1 Surface
810.2.1 Surface. Bus stop boarding and alighting areas shall have a firm, stable surface.
- GameTime ADA Wide Ramp Attachment 3D
-
4.7.5 Openings
Openings in surface of the clear floor or ground spaces required by section 2.0 shall not allow passage of a sphere more than 1/2 inch (13 mm) in diameter....
- Boddingtons GrassCarpet™ Grass Protection Matting
-
4.1.3 Wheelchair Seating Space
Clear floor or ground space that is at least 30 inches by 48 inches shall be provided at each seating space that is required to be accessible and positioned for a forward approach to the...
-
1(2)(a)(ii) Site analysis test
(B) To determine the practicality of providing accessibility to planned multifamily dwellings based on the topography of the existing natural terrain, the minimum percentage of ground floor...
-
Clear Ground Space [1011.2]
A clear ground space must be provided at each outdoor constructed feature....
-
11B-306.2.3 Minimum required depth
Where toe clearance is required at an element as part of a clear floor space, the toe clearance shall extend 17 inches (432 mm) minimum under the element. Exceptions: 1. ...
-
Changes in Level - Accessible Route Tool
Changes in Level - Accessible Route Tool This handy tool was developed by Evan Terry Associates to assist its surveyors in measuring changes in level along an accessible...
-
11B-306.2.3 Minimum required depth
Where toe clearance is required at an element as part of a clear floor space, the toe clearance shall extend 17 inches (432 mm) minimum under the element. Exceptions:...
-
11B-306.2.3 Minimum required depth
Where toe clearance is required at an element as part of a clear floor space, the toe clearance shall extend 17 inches (432 mm) minimum under the element. Exceptions: The...
-
Utility and Sewage Hookups [1011.2, 1011.3, and 1011.6]
The clear ground space must be designed so that the hookups are located at the rear center of the space....
-
11B-233.3.1.2.6.2 Test number one, individual building test
To determine site impracticality, the slope would be measured at ground level from the point of the planned entrance on a straight line to: 1....
- GameTime Music Time Playground Equipment
- Kompan, Inc. M141 - Spring Seesaw
- TechniSoil G3® Pathway Liquid Polymer Stabilizer
- TechniSoil G3® Commercial Surface Liquid Polymer Stabilizer
- Inpro Corporation JointMaster® 300 Series Recessed Mount Floor Expansion Joint Covers
- Inpro Corporation JointMaster® 787 Series Floor Expansion Joint Covers
- Stabilizer Solutions Natural Decomposed Granite Pathway Stabilizer
- Inpro Corporation JointMaster® 101 Series Floor Expansion Joint Covers
- Kompan, Inc. Explorer ELE400008
- Kompan, Inc. Starsurfer GXY935