M13. For each type of dispenser, receptacle, or equipment, is there clear floor space at least 30 inches wide x 48 inches long adjacent to the control or dispenser (positioned either...
Search Results "EVCS: Electric Vehicle Charging Station"
Commonly Searched Documents
-
M13
-
Attachment A
Table 1 – Accessibility Guidelines for PV Systems over Existing Parking Project Type Parking Currently Accessible? 22 Proposed Solar Photovoltaic (PV)...
-
9.3.2 Equivalent Facilitation
For purposes of this section, equivalent facilitation shall include the installation of electrical outlets (including outlets connected to a facility’s central alarm system) and telephone...
-
H. Chapter 7: Communication Features
Chapter 7 in the 2016 Non-Rail Vehicle Guidelines establishes technical requirements for characters on signs, the International Symbol of Accessibility, and vehicular announcement systems...
-
§100.205(c)(3)
(3) All premises within covered multifamily dwelling units contain the following features of adaptable design:
-
R310.3.2 Length
Access aisles shall extend the full length of the vehicle pull-up spaces they serve....
-
§ 37.42(d)
(d) Before constructing or altering a platform at a station covered by paragraph (c) of this section, at which a railroad proposes to use a means other than level-entry boarding, the railroad...
-
§ 37.42(d)
(d) Before constructing or altering a platform at a station covered by paragraph (c) of this section, at which a railroad proposes to use a means other than level-entry boarding, the railroad...
-
II. Rulemaking History
vehicles are readily accessible to and usable by individuals with disabilities....
-
T103 Definitions
transportation vehicles....
-
D. Chapter 3: Building Blocks
Chapter 3 in the 2016 Non-Rail Vehicle Guidelines has been significantly reorganized from the proposed rule....
-
§ 38.83(b)(8) Platform entrance ramp
The entrance ramp, or loading-edge barrier used as a ramp, shall not exceed a slope of 1:8 measured on level ground, for a maximum rise of 3 inches, and the transition from the station platform...
-
Passenger Loading Zones
The 1991 Standards and the 2010 Standards both include technical requirements for the vehicle pull-up space (96 inches wide minimum and 20 feet long minimum)....
-
T504 Fare Collection Devices
Section T504 in the 2016 Non-Rail Vehicle Guidelines establishes specifications for the location of fare collection devices (to ensure that such devices do not impede wheelchair movement...
- QUANTUM
-
How are accessible passenger loading zone aisles to be marked?
Vehicle pull-up spaces are not required to be marked....
-
T304 Operable Parts
The technical requirements for operable parts in the 2016 Non-Rail Vehicle Guidelines remain the same as in the proposed rule; however, they have been slightly reorganized so that all requirements...
-
[F] 907.4.2.2 Height
[F] 907.4.2.2 Height. The height of the manual fire alarm boxes shall be a minimum of 42 inches (1067 mm) and a maximum of 48 inches (1219 mm) measured vertically, from the floor...
-
907.2.7 Group M
A manual fire alarm system shall be installed in Group M occupancies having an occupant load of 500 or more persons or more than 100 persons above or below the lowest level of exit...
-
907.2.7.1 Occupant notification
During times that the building is occupied, in lieu of the automatic activation of alarm notification appliances, the manual fire alarm system shall be allowed to activate an alarm...
-
Requirements to Remember for: Commuter Rail Projects
[See subsections ...]
-
10.3.1(8)
(8) Platform edges bordering a drop-off and not protected by platform screens or guard rails shall have a detectable warning. Such detectable warnings shall comply with 4.29.2 and...
-
C. Chapter 2: Scoping Requirements
Chapter 2 in the 2016 Non-Rail Vehicle Guidelines has been substantially reorganized to present a more simplified approach....
-
T703 International Symbol of Accessibility
[See subsections ...]