Add a logo band to portray spirit and branding. 40 gallon top-opening style 36 gallon side-opening style Constructed of cast aluminum sides and door; spun aluminum top; cast iron...
Search Results "Capital Construction Cost"
- Landscape Forms Inc. Chase Park Trash Receptacle
-
V. Support Costs
"Support Costs" means only those incremental costs and expenses incurred by the City as a result of implementing or performing the terms of this Settlement Agreement which would not otherwise...
-
BENEFITS AND COSTS: OVERVIEW
BENEFITS AND COSTS: OVERVIEW Based on our analysis, we determined that transfer surface height requirements lower than 19 inches would increase the cost of designing and manufacturing...
- Pilot Rock CN-OKR Oak Knoll Collection Trash Receptacle
-
7. Support Costs
Support Costs The City will only charge incremental costs that the City will incur as a result of implementing the program, which would not otherwise be incurred if the program did not...
- Pilot Rock BPR1 Bear Resistant Trash Receptacle
-
Flange way gap
For rail projects, no flange way gap can be greater than 2.5" where passenger circulation paths cross tracks at grade (i.e. a street-level pedestrian crossing over streetcar tracks)....
-
Summary of Costs and Benefits
We estimated the additional costs under three scenarios....
- Bosch 3-Point Self-Leveling Alignment Laser GPL 3
- Bosch Five-Point Self-Leveling Alignment Laser GPL 5 S
- Bosch 3 Point Self Leveling Alignment Laser Level GPL 3 S
-
Standards Applicable Prior to March 15, 2012
use the 2010 Standards as adopted in the Title II regulations, except that Exception (1) in Section 206.2.3 does not apply, as an acceptable alternative accessibility standard for new construction...
-
1011.1 General
This section contains the technical requirements for outdoor constructed features provided within camping facilities, picnic facilities, viewing areas, and trailheads or on trails....
-
Overview
Newly constructed and altered pools must meet these requirements. Public entities and public accommodations also have obligations with respect to existing pools....
-
Attorney’s Fees and Costs
Attorney’s Fees and Costs – The City shall pay Class Counsel $13.3 million as reasonable attorney’s fees and $1.7 million for costs and expenses, for a total of $15 million....
-
Accessibility Standards in Title II Regulations Issued by DOJ
The Title II regulations provide that design, construction, and alterations of facilities commenced after January 26, 1992, must be done in such a manner that the facility or part of the...
-
United States of America v. Quiktrip Corporation - Consent Decree
IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF NEBRASKA Omaha Division THE UNITED STATES OF AMERICA, Plaintiff, v. QUIKTRIP...
-
4.1.3(5)*
In new construction if a building or facility is eligible for this exemption but a full passenger elevator is nonetheless planned, that elevator shall meet the requirements of 4.10 and shall...
-
LEGAL OPINION - U.S. DEPARTMENT OF TRANSPORTATION OFFICE of GENERAL COUNSEL on 49 CFR 37.43(a)
May 2016
-
§ 37.43(a)
(a)
- Magnuson Group UMEA Waste Receptacles
-
2. a. iii. Costs
Costs Leases should be reviewed to determine if the property owner or tenant is responsible for the cost of any ADA related changes.viii The existence of an accessible parking...
- Sears Brands, LLC Craftsman 10 in. Digital LaserTrac® Level
- Husky 10" Multi-Function Standard Digital Level