1.1.16 Alternate measurement tools. Ramps may be measured with instruments other than a digital inclinometer if they provide the data required for evaluation of tolerances as given...
Search Results "Construction Site"
Commonly Searched Documents
-
1.1.16 Alternate measurement tools
-
1.1.6 Flatness of walk cross slope
1.1.6 Flatness of walk cross slope. For walks and other pedestrian paths, measure flatness of the cross slope by placing a 24 - in. (600 mm) digital inclinometer perpendicular to the...
-
Kompan, Inc. M243P - Crocodile Bench
Requires the Premium User plan or above. (Login or upgrade your account!)
-
ALTERATION
Any construction or renovation to an existing structure other than repair or addition....
-
II. GENERAL NONDISCRIMINATION REQUIREMENTS
Failing or refusing to design and construct QuikTrip Stores that are readily accessible to and usable by individuals with disabilities in full compliance with 42 U.S.C. § 12183(a)(1), 28...
-
Facility
Facilities must comply with all 2010 ADA Standards for Accessible Design for new construction and remodeling projects....
-
1019.1 General
Compliance cannot be accomplished with the prevailing construction practices. 3. Compliance would fundamentally alter the function or purpose of the facility or the setting. 4....
-
1019.1 General
Compliance cannot be accomplished with the prevailing construction practices. 3. Compliance would fundamentally alter the function or purpose of the facility or the setting. 4....
-
11B-809.8 Doors
Exterior landings of impervious construction (e.g., concrete, brick, flagstone) serving primary entry doors and required exit doors are limited to not more than 1/2 inch (12.7 mm) of change...
-
3. If I comply with the California accessibility requirements, am I in compliance with ADA?
Remember that the accessibility requirements are reviewed by the building department only when a project is submitted for permit (meaning when you design, construct, alter, remodel, add,...
-
Do facilities in remote locations have to be accessible?
Any facility newly constructed or significantly altered by or for the Forest Service (buildings, toilets, picnic tables, fire rings, etc.), must be accessible, with very few exceptions....
- Landscape Forms Inc. Chase Park Trash Receptacle
-
Section 35.151(k) Detention and correctional facilities (Section-by-Section Analysis)
The 2004 ADAAG established specific requirements for the design and construction and alterations of cells in correctional facilities for the first time....
-
ADA Safe Harbor Provisions
(i) Newly constructed or altered facilities or elements covered by §§ 35.151(a) or (b) that were constructed or altered before March 15, 2012, and that do not comply with the 1991 Standards...
-
B. 2004 ADA and ABA Accessibility Guidelines
Until HUD adopts a new accessibility standard, HUD recipients who undertake alterations or new construction of a project may continue to utilize UFAS and HUD’s Section 504 or ABA regulations...
-
22. Q. We are building a new prison. Do we need to make it accessible?
Unlike modifications of existing facilities, there is no undue burden limitation for new construction....
-
ADA & Level Boarding - When Does Section 37.42 begin to apply?
49 CFR §37.42(a) DECEMBER 14, 2011
-
Sec.36.401(d)(2)(ii)
(ii) A terminal, depot, or other station used for specified public transportation, or an airport passenger terminal. In such a facility, any area housing passenger services,...
-
§100.205(e)
(e)
-
1.1.7 Measurement of parking areas
1.1.7 Measurement of parking areas. Only accessible access aisles and passenger loading zones that are part of a larger parking area need to be measured. These areas should be...
-
1.1.5 Flatness of walk running slope
1.1.5 Flatness of walk running slope. For pedestrian paths up to and including 6 ft (1.8 m) wide, measure for flatness of the running slope at 10 ft (3 m) increments along the...
-
Compliance Determinations by State and Local Jurisdictions
The commenters noted that (1)Â 100.205(g) encourages States and units of general local government to include, in their existing procedures for the review and approval of newly constructed...
-
When do path of travel and/or accessible routes apply? …new construction? …alterations to a parking area? …alterations to a building associated with parking, such as expansion or remodel?
In the new construction of a new facility, all accessible rooms and spaces are required to be connected by an accessible route and all toilet facilities, drinking fountains, public telephones...
- Landscape Forms Inc. Austin Trash Receptacle