[DSA-AC] A horizontal, generally level surface, whether raised above, recessed below or level with a transit rail, from which persons embark/disembark a fixed rail vehicle....
Search Results "Bus Rapid Transit"
-
TRANSIT BOARDING PLATFORM
-
Administrative Requirements
Develop a transition plan if structural changes are necessary for achieving program accessibility....
-
(1)(a)
(a) The minimum clear floor area should be 35 inches (890 mm) by 60 inches (1525 mm). Permanently installed fixtures may overlap this area a maximum of 6 inches (150 mm), if the...
- Figure 1003.3.2 (Exception 2) Edge Protection at Boarding Piers – Drawing from the U.S. Access Board
- Figure 1003.3.2 Boarding Pier Clearance – Drawing from the U.S. Access Board
- Figure 1003.3.2 (Exception 1) Clear Pier Space Reduction at Boarding Piers – Drawing from the U.S. Access Board
-
Required for Public Entities with Fifty or more Employees
[See subsections ...]
-
3) Where the standard says "Changes in level are not permitted", but no advisory follows the standard
3) Where the standard says "Changes in level are not permitted", but no advisory follows the standard, such as 404.2.4.4 floor or ground surfaces at doors: Although the Advisory...
-
Q8: Curb Ramp Replaced as Part of a Resurfacing Alteration and Adjacent Sidewalk
Public entities are required to address other barriers on existing sidewalks, such as steep cross slopes or obstructions, as part of their on-going program access and transition plan obligations...
-
Title II Public Entity Facilities Compliance Timetable
Begin transition plan outlining structural changes required for program accessibility and proceed with structural changes, as required, to facilities "as expeditiously as possible". (35.150...
-
Program Accessibility
Under Section 504, self-evaluations and transition plans should have been completed by December 29, 1979. ...
-
(1)(c)
(c) A grab bar at least 24 inches (610 mm) long should be mounted behind the water closet, and a horizontal grab bar at least 40 inches (1015 mm) long should be mounted on at least...
-
§ 37.51 Key stations in commuter rail systems
[56 FR 45621, Sept. 6, 1991, as amended at 58 FR 63102, Nov. 30, 1993; 79 FR 21405, Apr. 16, 2014]
-
§104.22 Existing facilities.
[45 FR 30936, May 9, 1980, as amended at 65 FR 68055, Nov. 13, 2000]
-
Surface and Size [§305.2 and §305.3]
Surface and Size [§305.2 and §305.3] Clear floor spaces must meet requirements for ground and floor surfaces, including criteria for firmness, stability, and slip resistance....
-
Identify Departments and Programs
If structural changes are needed, include them in the transition plan. The self-evaluation forms on this website are in fillable PDF, Word and text for Brailling. ...
-
Best Practices
Planning Grants will also be available for applicants that have not yet met the administrative requirements set forth in Title II of the ADA and do not have Self-Evaluation or Transitions...
- Safepath EZ Edge™ Transition
-
The Hardest Astrology Transits That Change People Forever
Some astrology transits completely reshape a person’s life....
-
§ 37.169 Process to be used by public entities providing designated public transportation service in considering requests for reasonable modification
[See subsections ...]
-
Title II Quiz
Test your knowledge. There are five quizzes. All the quizzes cover the same topics: general ADA, effective communication, facility/program accessibility, general Title II...
-
Path of travel
The path of travel to the altered or added portion of the facility must be made accessible, to the maximum extent feasible. (DOT ADA Regulation 49 C.F.R. 37.43(a)(2) and DOT ADA...
- DOT/FTA Americans with Disabilities Act (ADA): Guidance Circular FTA C 4710.1