This included a requirement that the touch surface of TTY keypads be 30 to 34 inches high (704.4.1). Comment....
Search Results "Fire-Building Surface"
Commonly Searched Documents
-
TTYs
-
11B-703.4.2 Location
When tactile signs are mounted inconsistently on surrounding wall surfaces, or mounted on the door itself, they are difficult to find and may create a safety hazard....
-
M305.2.4 Cross Section (Section-by-Section Analysis)
The Access Board sought input in MDE NPRM preamble question 21, on whether the gripping surfaces of current transfer supports on different types of equipment meet the cross sectional dimensions...
-
5.8.1.1 Clear Platform Size Recommendation
33.8 34 -- -- -- 34.5 The Wheeled Mobility Anthropometry Project recommends a minimum flat surface...
-
Trailhead Information Signs [F216.13 and 1017.10]
The new trail information signs must include the following information: Length of the trail or trail segment Type of trail surface Typical and minimum trail tread...
-
T402 Ramps and Bridgeplates
The technical requirements for ramps and bridgeplates in the 2016 Non-Rail Vehicle Guidelines include provisions on design load, installation and operation, emergency operation, surfaces...
-
Water Hydrants
Locate water spouts between 28 inches (710 millimeters) and 36 inches (915 millimeters) above the ground or floor surface on the edge of a clear space that is at least 72 inches (1,830 millimeters...
-
F - number system
The flatness number also gives an indication of the "bumpiness" of the surface. The F - number system develops two number ratings, the FF and the FL....
-
11B-703.4.2 Location
When tactile signs are mounted inconsistently on surrounding wall surfaces, or mounted on the door itself, they are difficult to find and may create a safety hazard....
-
11B-703.4.2 Location
When tactile signs are mounted inconsistently on surrounding wall surfaces, or mounted on the door itself, they are difficult to find and may create a safety hazard....
-
Scoping for timeshare or condominium hotels. (Section-by-Section Analysis)
One commenter asked the Department how developers should scope units where buildings are constructed in phases over a span of years, recommending that the scoping be based on the total number...
- American Standard Cadet 1.1 gpf FloWise Right Height Pressure Assisted Elongated Toilet 2467100
- American Standard Yorkville 1.1 gpf FloWise Right Height Elongated Pressure Assisted Toilet
-
Eunice Noell-Waggoner, IES, LC. Lighting Issues
Right now people are designing buildings for security reasons, although they are not on top of the energy savings that we can have by controls; not having to light buildings when they aren...
- Ronald L. Mace Universal Design Institute
- Environmental Health Network
- Bradley Chrome-Plated Die Cast Single Robe Hook 931
- American Specialties Circular Counter Top Waste Chute 1000
- American Specialties Single Robe Hook 0740-Z
- Image Identification Project
- Bradley 3-Station Frequency Lavatory System FL-3H & FL-3L
- Door King Inc. 1803 Telephone Entry System
- Wikk Industries Inc. PART# BPS SM-HL/LO CLEAR (628)
-
Opening Remarks and Introductions
We have a couple of types of buildings that reflect blind rehab centers....