The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48....
Search Results "Tread Surface"
Commonly Searched Documents
-
403.3 Slope
-
Conclusions
All the surfaces pass the existing specifications for impact attenuation of playground surfaces. 2....
-
403.3 Slope
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48....
-
Clear Width [1016.3]
The clear width of ORARs must be a minimum of 36 inches. The 36-inch-minimum clear width must be maintained for the entire ORAR and may not be reduced by gates, barriers, or...
-
Gates, Bars, and Berms
Forest Service-constructed barriers on pedestrian travel routes must have a 32-inch minimum width gap or include a route beside them that will permit passage of a wheelchair....
-
1018.4 Clear Width
This section requires the clear width of beach access routes to be 60 inches minimum to enable individuals who use wheeled mobility devices to pass beach visitors traveling in the...
-
1011.5.2 Cooking Surfaces
Where provided, cooking surfaces shall be 15 inches (380 mm) minimum and 34 inches (865 mm) maximum above the ground....
-
1011.5.2 Cooking Surfaces
Where provided, cooking surfaces shall be 15 inches (380 mm) minimum and 34 inches (865 mm) maximum above the ground....
-
1016.4 Passing Spaces
inches (1525 mm), where the route is: --Heavily used or adjoins elements, space, or facilities that are heavily used; or --A boardwalk or otherwise not at the same level as the ground surface...
-
1016.4 Passing Spaces
inches (1525 mm), where the route is: • Heavily used or adjoins elements, space, or facilities that are heavily used; or • A boardwalk or otherwise not at the same level as the ground surface...
- WoodCarpet Ground Surface System: WoodCarpet Mat Installation Video
-
3.2.4 Slope
The ground surface in all camp living areas shall have a slope of no more than 1:48 (2 percent) in any direction. Exception....
- NanoPave® 2-in-1 Joint Stabilizer and Sealer
-
11B-302.3 Openings
Openings in floor or ground surfaces shall not allow passage of a sphere more than ½ inch (12.7 mm) diameter except as allowed in Sections 11B-407.4.3, 11B-409.4.3, 11B-410.4, 11B-810.5.3...
-
(3) Adjustability: Transfer Surface Intermediate Heights
In the MDE NPRM there was no requirement for the transfer surface to have intermediate transfer heights....
-
Performance and the Surface Deficiency Score
In an effort to statistically analyze the frequency of identifiable deficiencies between surface types, the Surface Deficiency Score (SDS) was developed. ...
-
High work surface
All of the seating spaces/work surfaces were approximately 42" high....
-
11B-302.3 Openings
Openings in floor or ground surfaces shall not allow passage of a sphere more than ½ inch (12.7 mm) diameter except as allowed in Sections 11B-407.4.3 _|Platform to Hoistway Clearance|_,...
-
T302 Walking Surfaces
The technical requirements for walking surfaces include provisions on slip resistance, the maximum size of surface openings, and the maximum height of vertical surface discontinuities (i.e...
-
A4.5.3 Carpet
Much more needs to be done in developing both quantitative and qualitative criteria for carpeting (i.e., problems associated with texture and weave need to be studied). However,...
-
Carpet [§302.2]
Carpet [§302.2] Carpet that is thick, cushiony, or loose impairs accessibility, particularly wheelchair maneuvering. The standards specify the maximum pile height (1/2” measured...
-
14) Carpet and carpet tile
14) Carpet and carpet tile ADAAG: Same standards for carpet and carpet tile: maximum pile height of 1/2" (§4.5.3). UFAS: Carpet must have maximum pile height of 1/2". Carpet...
-
M303.2.5 Surfaces (Section-by-Section Analysis)
The MDE NPRM proposed to require diagnostic equipment used by patients seated in a wheelchair to provide a wheelchair space with a surface that does not slope more than 1:48 in any direction...
-
Acceptable SEWF Systems
Because of their reactivity, the stabilizing binders needed to be applied on site or mixed with EWF no longer than 1 h prior to placement on the ground surface....