Search Results "Bus Rapid Transit"
Commonly Searched Documents
- Figure 1003.3.2 Boarding Pier Clearance – Drawing from the U.S. Access Board
- Figure 1003.3.2 (Exception 1) Clear Pier Space Reduction at Boarding Piers – Drawing from the U.S. Access Board
-
Q8: Curb Ramp Replaced as Part of a Resurfacing Alteration and Adjacent Sidewalk
Public entities are required to address other barriers on existing sidewalks, such as steep cross slopes or obstructions, as part of their on-going program access and transition plan obligations...
-
Required for Public Entities with Fifty or more Employees
[See subsections ...]
-
3) Where the standard says "Changes in level are not permitted", but no advisory follows the standard
3) Where the standard says "Changes in level are not permitted", but no advisory follows the standard, such as 404.2.4.4 floor or ground surfaces at doors: Although the Advisory...
-
Title II Public Entity Facilities Compliance Timetable
Begin transition plan outlining structural changes required for program accessibility and proceed with structural changes, as required, to facilities "as expeditiously as possible". (35.150...
-
(1)(c)
(c) A grab bar at least 24 inches (610 mm) long should be mounted behind the water closet, and a horizontal grab bar at least 40 inches (1015 mm) long should be mounted on at least...
-
Program Accessibility
Under Section 504, self-evaluations and transition plans should have been completed by December 29, 1979. ...
-
§ 37.51 Key stations in commuter rail systems
[56 FR 45621, Sept. 6, 1991, as amended at 58 FR 63102, Nov. 30, 1993; 79 FR 21405, Apr. 16, 2014]
-
DSA IR 11B-2: BEVELED LIP AT CURB RAMPS (with revisions issued through Jan. 2011)
General: California Building Code (CBC) Section 1127B.5 Item 3 states: "Transitions from ramps to walks, gutters, or streets shall be flush and free of abrupt changes, except that curb ramps...
-
Identify Departments and Programs
If structural changes are needed, include them in the transition plan. The self-evaluation forms on this website are in fillable PDF, Word and text for Brailling. ...
-
§104.22 Existing facilities.
[45 FR 30936, May 9, 1980, as amended at 65 FR 68055, Nov. 13, 2000]
-
Surface and Size [§305.2 and §305.3]
Surface and Size [§305.2 and §305.3] Clear floor spaces must meet requirements for ground and floor surfaces, including criteria for firmness, stability, and slip resistance....
-
Best Practices
Planning Grants will also be available for applicants that have not yet met the administrative requirements set forth in Title II of the ADA and do not have Self-Evaluation or Transitions...
-
§ 37.169 Process to be used by public entities providing designated public transportation service in considering requests for reasonable modification
[See subsections ...]
- Safepath EZ Edge™ Transition
- DOT/FTA Americans with Disabilities Act (ADA): Guidance Circular FTA C 4710.1
-
Title II Quiz
Test your knowledge. There are five quizzes. All the quizzes cover the same topics: general ADA, effective communication, facility/program accessibility, general Title II...
-
Path of travel
The path of travel to the altered or added portion of the facility must be made accessible, to the maximum extent feasible. (DOT ADA Regulation 49 C.F.R. 37.43(a)(2) and DOT ADA...
-
NPRM and Comments
The NPRM asked whether there should be any specific requirements for bus rapid transit (BRT) systems, which share some of the characteristics of fixed-route bus systems and some characteristics...
-
Accessible Sidewalks 1: Pedestrians who use Wheelchairs
Requires the Registered User plan or above. Login!
- EZ-ACCESS Transitions® Modular Entry Mat
-
Annualized Costs to Large Transit Entities for Automated Announcement Systems
on their large vehicles operating in fixed route bus service....
-
Specific Spaces and Occupancies
Scoping provisions for specific spaces and occupancies address: Transportation Facilities (§218) and Bus Stops (§209) Assembly Areas (§221) * ...
