Search Results "ISA: International Symbol of Accessibility"
- Figure 604.5.1 Side Wall Grab Bar at Water Closets – Drawing from the U.S. Access Board
- Figure 604.5.2 Rear Wall Grab Bar at Water Closets – Drawing from the U.S. Access Board
- Figure 409.4.6.2 Location of Private Residence Elevator Control Panel – Drawing from the U.S. Access Board
- Figure 405.9.1 Extended Floor or Ground Surface Edge Protection – Drawing from the U.S. Access Board
-
Willoughby Industries UW-1317-HEU-FA Series Contoured High Efficiency Urinal Front Access
Requires the Premium User plan or above. (Login or upgrade your account!)
- Figure 608.3.2 Grab Bars for Standard Roll-In Type Showers – Drawing from the U.S. Access Board
- Figure 608.2.1 Transfer Type Shower Compartment Size and Clearance – Drawing from the U.S. Access Board
- Figure 404.2.4.3(c) Maneuvering Clearance at Recessed Doors and Gates – Drawing from the U.S. Access Board
- Figure 404.2.4.3(b) Maneuvering Clearance at Recessed Doors and Gates – Drawing from the U.S. Access Board
- Figure 406.2 Counter Slope of Surface Adjacent to Curb Ramps – Drawing from the U.S. Access Board
- Figure 609.2.2 Grab Bar Non-Circular Cross Section – Drawing from the U.S. Access Board
- Figure 608.3.3 Grab Bars for Alternate Roll-In Type Showers – Drawing from the U.S. Access Board
- Figure 1003.3.1 (Exception 2) Edge Protection at Boat Slips – Drawing from the U.S. Access Board
- Figure 608.5.1 Transfer Type Shower Compartment Control Location – Drawing from the U.S. Access Board
-
C. REMEDIAL ACTION
through the BIDMC campuses, accessible parking areas, accessible entrances to buildings, and accessible spaces within buildings....
-
Employee Parking Lot
Where more than one parking facility is provided on a site, the number of accessible spaces provided on the site shall be calculated according to the number of spaces required for each parking...
-
Ground Floor
To bring these buildings into compliance with the Act, one of the commenters recommended that the Department adopt a proposal under consideration by the International Conference of Building...
-
§382.133(d)(2)
00400; (vi) DeVilbiss Healthcare iGo; (vii) Inogen One; (viii) Inogen One G2; (ix) Inogen One G3; (x) Inova Labs LifeChoice; (xi) Inova Labs LifeChoice Activox; (xii) International...
-
§382.133(c)(2)
00400; (vi) DeVilbiss Healthcare iGo; (vii) Inogen One; (viii) Inogen One G2; (ix) Inogen One G3; (x) Inova Labs LifeChoice; (xi) Inova Labs LifeChoice Activox; (xii) International...
-
5.7.1.1 Lift Compatibility Clearance in Base for Stretchers (M301)
The change harmonizes this provision with the international standards. IEC 60601-2-52 provides requirements for stretchers and includes a lift clearance at the 39 inch width....
-
Executive Order 12866
The final rule also codifies existing internal administrative practices concerning disability law guidance. This proposal would have no cost impacts on regulated parties....
- Center for Inclusive Design and Environmental Access (IDeA Center)