11B-602.6 Water flow. The spout shall provide a flow of water 4 inches (102 mm) high minimum and shall be located 5 inches (127 mm) maximum from the front of the unit....
Search Results "Pedestrian Flow"
Commonly Searched Documents
-
11B-602.6 Water flow
-
Pedestrian Circulation Path
Pedestrian Circulation Path. A prepared exterior or interior surface provided for pedestrian travel in the public right-of-way....
-
11B-602.6 Water flow
The spout shall provide a flow of water 4 inches (102 mm) high minimum and shall be located 5 inches (127 mm) maximum from the front of the unit....
-
11B-602.6 Water flow
The spout shall provide a flow of water 4 inches (102 mm) high minimum and shall be located 5 inches (127 mm) maximum from the front of the unit....
-
R306 Pedestrian Street Crossings (Section-by-Section Analysis)
R306 Pedestrian Street Crossings (Section-by-Section Analysis) The technical requirements in R306 address pedestrian signal phase timing and pedestrian street crossings at roundabouts...
-
R206 Pedestrian Street Crossings (Section-by-Section Analysis)
R206 Pedestrian Street Crossings (Section-by-Section Analysis) Pedestrian street crossings must comply with technical requirements in Chapter R3 that reference MUTCD standards for pedestrian...
-
R306.3.2 Pedestrian Activated Signals
R306.3.2 Pedestrian Activated Signals....
-
R302.5.1 Pedestrian Street Crossings
R302.5.1 Pedestrian Street Crossings....
- Accessible Shared Streets: Notable Practices and Considerations for Accommodating Pedestrians with Vision Disabilities
-
11B-604.7 Dispensers and disposal units
Dispensers shall not be of a type that controls delivery or that does not allow continuous paper flow....
-
R205 Alternate Pedestrian Access Routes
R205 Alternate Pedestrian Access Routes....
-
R302 Pedestrian Access Routes
R302 Pedestrian Access Routes...
-
R204 Pedestrian Access Routes
R204 Pedestrian Access Routes...
-
R302.5.3 Within Pedestrian Street Crossings
R302.5.3 Within Pedestrian Street Crossings....
-
R306.2 Pedestrian Signal Phase Timing
R306.2 Pedestrian Signal Phase Timing....
-
R204 and R302 Pedestrian Access Routes
R204 and R302 Pedestrian Access Routes The SNPRM would revise these sections relating to pedestrian access routes....
-
Pedestrian Access Route
Pedestrian Access Route. A continuous and unobstructed path of travel provided for pedestrians with disabilities within or coinciding with a pedestrian circulation path....
-
Hiker/Pedestrian Trail
A trail with a designed use of hiker/pedestrian that is designed, constructed, and maintained for hiker/pedestrian use. ...
-
R303 Alternate Pedestrian Access Routes
R303 Alternate Pedestrian Access Routes (See R205)...
-
R204 Pedestrian Access Routes (Section-by-Section Analysis)
R204 Pedestrian Access Routes (Section-by-Section Analysis) A pedestrian access route is a continuous and unobstructed path of travel provided for pedestrians with disabilities within...
-
Pedestrian Signal Phase Timing (Section-by-Section Analysis)
Pedestrian Signal Phase Timing (Section-by-Section Analysis) Pedestrian signal phase timing must comply with referenced MUTCD standards and use a pedestrian clearance time that is calculated...
-
R209.1 General
Where pedestrian signals are provided at pedestrian street crossings, they shall include accessible pedestrian signals and pedestrian pushbuttons complying with sections 4E.08 through 4E...
-
R305.2.4 Pedestrian Refuge Islands
R305.2.4 Pedestrian Refuge Islands....
-
604.7 Dispensers
Dispensers shall not be of a type that controls delivery or that does not allow continuous paper flow. Advisory 604.7 Dispensers....