1.2.2 Use datum dimensioning referenced to a primary or secondary control point on the construction site when the position of one item is particularly important....
Search Results "Site Arrival Point"
-
1.2.2
-
10.1 Q. Is it necessary to have an accessible path of travel from a subterranean garage to single-story covered multifamily dwellings built on top of the garage?
the Guidelines, there would have to be an accessible route leading to grade level entrances serving the single-story dwelling units from a public street or sidewalk or other pedestrian arrival...
-
11B-216.6 Entrances
Directional signs are needed where the accessible route diverges from the route for the general public and should be located at decision points (for example where the path to the stairs...
-
11B-216.6 Entrances
Directional signs are needed where the accessible route diverges from the route for the general public and should be located at decision points (for example where the path to the stairs...
-
Additional Design Specifications for Requirement 1
elevator connecting the parking area with any floor on which dwelling units are located, and (2) an elevated walkway is planned between a building entrance and a vehicular or pedestrian arrival...
-
Accessible Route - Exterior
Error/Omission: The pedestrian routes on a site from public transportation stops, accessible parking spaces, passenger loading zones, and public streets and sidewalks to the accessible...
- Access Board: Sales and Service Counters
-
4.1.7(3)(a)
(a) At least one accessible route complying with 4.3 from a site access point to an accessible entrance shall be provided....
-
4.1.7(2)(a)
(a) At least one accessible route complying with 4.3 from a site access point to an accessible entrance shall be provided....
-
When do path of travel and/or accessible routes apply? …new construction? …alterations to a parking area? …alterations to a building associated with parking, such as expansion or remodel?
alteration, drinking fountains serving the area of alteration, public telephones serving the area of alteration, and signs as well as accessible routes which connect the area of alteration with site...
-
11B-809.5.6 Site, building, or floor entrance
Where a system, including a closed-circuit system, permitting voice communication between a visitor and the occupant of the residential dwelling unit is provided, the system shall...
-
Chapter 5: General Site and Building Elements
Chapter 5 provides technical criteria for parking spaces (502), passenger loading zones (503), stairways (504), and handrails (505).
-
Chapter 5: General Site and Building Elements
[See subsections ...]
-
DIVISION 5: GENERAL SITE AND BUILDING ELEMENTS
[See subsections ...]
-
11B-809.5.6 Site, building, or floor entrance
Where a system, including a closed-circuit system, permitting voice communication between a visitor and the occupant of the residential dwelling unit is provided, the system shall...
-
DIVISION 5: GENERAL SITE AND BUILDING ELEMENTS
[See subsections ...]
-
11B-809.5.6 Site, building, or floor entrance
Where a system, including a closed-circuit system, permitting voice communication between a visitor and the occupant of the residential dwelling unit is provided, the system shall...
-
What Does Your Event Need? Creating a Needs Assessment
What is an affordable price point for hotel rooms in the area if overnight accommodations are needed?...
-
DOT Response
We believe that it is best to defer action on this issue until the DOT and DOJ work is further advanced, at which point we believe it appropriate to propose changes to our ADA rules consistent...
-
Capacity Constraints
To violate this provision, there must be both a substantial number of late arrivals and the late arrivals in question must be significant in length....
-
Vanpool
Vanpools are used for daily work trips, between commuters' homes (or collection points near them) and work sites (or drop points near them)....
-
1. Typical Issues
Typical Issues During an evacuation, some individuals with a mobility disability may arrive at the shelter in a car or van....
-
1. Accessible route(s)
Connecting accessible buildings, facilities, elements and spaces that are on the same site....
-
12. I am doing a small tenant improvement project, but I cannot afford the required accessibility improvements. Can I claim a hardship exemption?
called "path-of-travel" improvements, are improvements that are not part of the area of alteration, but require improved access to the altered area from accessible parking stalls and other site...
