It is offered in a variety of functions and configurations, to meet the most demanding door control applications....
Search Results "Control End Wall"
- TownSteel MS Series, Grade 1 with Push Pull Mortise Locks
-
Designed and Constructed for First Occupancy (Preamble, Section-by-Section Analysis)
In this case, it is the date of the later application that would control, unless construction is not completed within the time allowed by the permit, in which case a third permit would be...
-
Triggering event
Some commenters expressed concern that using the date of “ start of construction’’ was problematic because the date can be affected by factors that are outside the control of the owner....
-
Section 36.404 Alterations: Elevator Exemption (Preamble, Section-by-Section Analysis)
rental establishments, or (2) a series of buildings on a common site, connected by a common pedestrian access route above or below the ground floor, either under common ownership or common control...
-
§ 382.40 Boarding assistance for small aircraft
boarding assistance is not required to be provided under paragraph (c)(4) of this section, or cannot be provided as required by paragraphs (b) and (c) of this section for reasons beyond the control...
-
Background
The majority of comments received from individuals who identified themselves as being hard of hearing supported the rule and specifically supported increasing volume controls on customer...
-
4.2 Stretchers
Another component is the 6" high lift clearance window that forces foot operated controls up....
-
Trail Study Sites
The amount of waterline fluctuation was considered minimal at this beach because of the proximity of water control structures....
-
Guidelines for Requirement 7
The Department has eliminated the specification that controls for ranges and cooktops be placed so that reaching across burners is not required....
-
Best Practices
Rights Law; learning about issues affecting people with disabilities; providing information to the public on programs and services; ensuring that construction projects within the agency’s control...
-
Triggering event. (Section-by-Section Analysis)
Some commenters expressed concern that using the date of " start of construction'' was problematic because the date can be affected by factors that are outside the control of the owner....
-
Table 3
DOJ 2010 Standards.26 The requirements in the proposed guidelines in Table 3 are compared to other applicable accessibility standards and the 2009 edition of Manual on Uniform Traffic Control...
-
Designed and Constructed for First Occupancy (Section-By-Section Analysis and Response to Comments)
In this case, it is the date of the later application that would control, unless construction is not completed within the time allowed by the permit, in which case a third permit would be...
-
Category 2 Eligibility
However, if temporary conditions not under the operator's control (e.g., construction, an accident, a landslide) make it so hazardous for anyone to disembark that the stop is temporarily...
- ADA25: #20 of 25 -- Video Relay Service (VRS)
-
4. Comparison of Proposed Technical Provisions Applicable to Shared Use Paths and AASHTO Guide
R302.6.1 Pedestrian Street Crossings Without Yield or Stop Control....
-
Section 2: References
Centers for Disease Control and Prevention. Environmental barriers to health care among persons with disabilities, Los Angeles county, California, 2002-2003....
-
4.1 Wheeled Mobility Device Dimensions
device sizes is available from manufacturers, it does not include actual dimensions as set up for individuals nor does it provide data on added equipment like seating systems, cushions, control...
-
1.1.3.2 State-regulated buildings, structures, and applications
Barbering, cosmetology or electrolysis establishments, acupuncture offices, pharmacies, veterinary facilities, and structural pest control locations regulated by the Department of Consumer...
-
New Construction
The commenter stated that some very old prison buildings have thick walls of concrete and reinforced steel that are difficult, if not impossible to retrofit, and to do so would be very expensive...
-
Common Use Circulation Paths in Employee Work Areas
For example, in a stock room of a department store significant existing physical constraints, such as having to move walls to avoid the loss of space to store inventory, may mean that it...
-
ALTERATION
restoration, resurfacing of circulation paths or vehicular ways, changes or rearrangement of the structural parts or elements, and changes or rearrangement in the plan configuration of walls...
-
Roberta Null, Ph.D., ASID. Training for Blind and Low Vision Persons: Color Contrast
And so their kitchen is usually a little one-wall kitchen that maybe would accommodate two people....
-
Issue 17: What design guidance on artificial/electric lighting for low vision persons can be provided in the short term?
Response by Jeanne Halloin: That’s one reason why you have to get in really early [during the design process] because if they have dark flooring or dark walls, there’s no way you’re going...
