The amount of waterline fluctuation was considered minimal at this beach because of the proximity of water control structures....
Search Results "Control End Wall"
Commonly Searched Documents
-
Trail Study Sites
-
Guidelines for Requirement 7
The Department has eliminated the specification that controls for ranges and cooktops be placed so that reaching across burners is not required....
-
Best Practices
Rights Law; learning about issues affecting people with disabilities; providing information to the public on programs and services; ensuring that construction projects within the agency’s control...
-
Triggering event. (Section-by-Section Analysis)
Some commenters expressed concern that using the date of " start of construction'' was problematic because the date can be affected by factors that are outside the control of the owner....
-
Table 3
DOJ 2010 Standards.26 The requirements in the proposed guidelines in Table 3 are compared to other applicable accessibility standards and the 2009 edition of Manual on Uniform Traffic Control...
-
Designed and Constructed for First Occupancy (Section-By-Section Analysis and Response to Comments)
In this case, it is the date of the later application that would control, unless construction is not completed within the time allowed by the permit, in which case a third permit would be...
-
Category 2 Eligibility
However, if temporary conditions not under the operator's control (e.g., construction, an accident, a landslide) make it so hazardous for anyone to disembark that the stop is temporarily...
- Acoustiguide Opus+ Multimedia Guiding System
- EVAC+CHAIR® 600H Stair Evacuation Chair with Lift Handles
- Detecto FHD Series Stationary Wheelchair Scale
- Strike First Corporation The Centurion™ Portable Fire Extinguisher Cabinet
- Bradley Standard Series Vertical Recessed Soap Dispenser
- Williams Sound PPA 458 NET PRO PERSONAL PA® PRO FM ASSISTIVE LISTENING SYSTEM
- Williams Sound PPA 458 PRO PERSONAL PA® PRO FM ASSISTIVE LISTENING SYSTEM
- Williams Sound PPA 457 PRO PERSONAL PA® PRO FM ASSISTIVE LISTENING SYSTEM
- AJW Architectural Products U1525EA Series Automatic 120 Volt Hand Dryer, White Powder Coat - Surface Mounted
- Mannington Mills Outlook Collection Commercial Carpet
- TownSteel MS Series, Grade 1 with Push Pull Mortise Locks
- Kohler Sensate Touchless Kitchen Faucet
- Populas Accella Adjustable Activity / Computer Workstation
- ES&S ExpressVote® UVS Universal Voting System
- Spectrum Industries Inc. Instructor Media Console and Workstation
- Guardian Barrier-Free Safety Station with WideArea™ Eye/Face Wash GBF1909PCC
-
When is accessibility required for a live work conversion project?
Question 3: Since this is not New Construction and interior structural walls are not be removed 11A is not applicable based on CBC 1102A.1 New Construction, correct?...