Presidio, designed to meet the rigors of unsecured spaces is visually strong and also transparent. It is tough, fail-safe, graffiti-resistant and remarkably refined....
Search Results "Pre-Construction Meeting"
- Landscape Forms Inc. Presidio Bench Collection
- Landscape Forms Inc. Melville Benches
- Landscape Forms Inc. Multiplicity Bench Collection
-
Supplementary Information:
to persons with disabilities, and established design and construction requirements to make these dwellings readily accessible to and usable by persons with disabilities....
-
Scope of Coverage
The Fair Housing Act requires that covered multifamily dwellings for first occupancy after March 13, 1991 be designed and constructed in accordance with the Act's accessibility requirements...
-
F245.2.5 Elements within Picnic Units with Mobility Features
This section contains the scoping requirements for elements within picnic units required to provide mobility features, including outdoor constructed features (F244.2.5.1) and parking spaces...
-
1.9.1 Division of the State Architect - Access Compliance.
Temporary buildings and facilities are not of permanent construction but are extensively used or are essential for public use for a period of time....
-
1.9.1 Division of the State Architect - Access Compliance.
Temporary buildings and facilities are not of permanent construction but are extensively used or are essential for public use for a period of time....
-
§100.205(i)
(i) This subpart does not invalidate or limit any law of a State or political subdivision of a State that requires dwellings to be designed and constructed in a manner that affords handicapped...
-
11B-206.2.3.2 Distance to Elevators
In new construction of buildings where elevators are required by Section 11B-206.2.3, and which exceed 10,000 square feet (929 m2) on any floor, an accessible means of vertical access via...
-
11B-206.2.3.2 Distance to Elevators
In new construction of buildings where elevators are required by Section 11B-206.2.3, and which exceed 10,000 square feet (929 m2) on any floor, an accessible means of vertical access via...
-
11B-206.2.3.2 Distance to Elevators
In new construction of buildings where elevators are required by Section 11B-206.2.3, and which exceed 10,000 square feet (929 m2) on any floor, an accessible means of vertical access via...
-
§ 37.41 Construction of transportation facilities by public entities
[56 FR 45621, Sept. 6, 1991, as amended at 71 FR 63266, Oct. 30, 2006]
-
2.9 Protruding Objects
Constructed features, including signs, water sources, and so forth shall not extend into the space above an ORAR more than 4 inches (100 mm) if they are between 27 inches (685 mm) and...
-
1.9.1 Division of the State Architect ─ Access Compliance
Temporary buildings and facilities are not of permanent construction but are extensively used or are essential for public use for a period of time....
- Why Corada?
-
Emergency Planning
Emergency planning must be done well in advance for all events, and it is important to know that facilities and their staff members are prepared. During your inspection, be sure...
-
Physical Accessibility
Under Section 504, facilities (such as buildings) that were built or altered on or after June 4, 1977, are referred to as new construction.110 Specific construction and design standards...
-
F247.3 Trailheads
This section requires at least 20 percent, but not less than one, of each type of outdoor constructed feature provided within trailheads to comply with the applicable technical requirements...
-
M. NEW CONSTRUCTION, ALTERATIONS, AND PHYSICAL CHANGES TO FACILITIES
All construction and alterations to County buildings and facilities by the County or on its behalf will comply with the requirements of 28 C.F.R. § 35.151, including applicable architectural...
-
Operable Parts [1011.3]
The operable parts of outdoor constructed features, such as handles, levers, and latches, must comply with the technical requirements of sections 309.3 and 309.4 of the ABA Standards...
-
232 Detention and Correctional Facilities
Detention and correctional facilities. (1) New construction of jails, prisons, and other detention and correctional facilities shall comply with the 2010 Standards except that public entities...
-
Landscape Forms Inc. Parc Vue Trash Receptacle
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Landscape Forms Inc. 35 Pitch Trash Receptacle
Requires the Premium User plan or above. (Login or upgrade your account!)
