[See subsections ...]
Search Results "Ground Level Play Component"
-
11B-1008 Play areas
-
11B-240 Play areas
[See subsections ...]
-
Extended Floor or Ground Surface: ADA Standard Section 405.9.1
Section 405.9.1 covers the current ADA Standards for extended floor or ground surface of the ramp run or landing.
-
1007.3.1 Start of Play
1007.3.1 Start of Play....
-
11B-206.2.17.2 Soft contained play structures
Where three or fewer entry points are provided for soft contained play structures, at least one entry point shall be on an accessible route....
-
11B-206.2.17.2 Soft contained play structures
Where three or fewer entry points are provided for soft contained play structures, at least one entry point shall be on an accessible route....
-
11B-411.4.8.2.2 Signal level
The verbal annunciator signal level shall comply with Section 11B-407.4.8.2.2....
-
11B-411.4.8.2.2 Signal level
The verbal annunciator signal level shall comply with Section 11B-407.4.8.2.2....
-
Leveling: ADA Standard Section 407.4.4
Section 407.4.4 covers the current ADA Standards for the self-leveling feature in elevator cars.
-
1008.2.6 Ground Surfaces
Ground surfaces on accessible routes, clear floor or ground spaces, and turning spaces shall comply with 1008.2.6. Advisory 1008.2.6 Ground Surfaces....
-
Start of Play Areas
Start of Play Areas The clear floor or ground space area at the start of play for each accessible hole must be 48 by 60 inches minimum to allow players to position themselves for the...
-
1007.3.1 Start of Play
A clear floor or ground space 48 inches (1220 mm) minimum by 60 inches (1525 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
1007.3.1 Start of Play
A clear floor or ground space 48 inches (1220 mm) minimum by 60 inches (1525 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
305.2 Floor or Ground Surfaces
305.2 Floor or Ground Surfaces. Floor or ground surfaces of a clear floor or ground space shall comply with 302. Changes in level are not permitted....
-
Teeing Ground
In golf, the starting place for the hole to be played....
-
TEEING GROUND
[DSA-AC] In golf, the starting place for the hole to be played....
-
TEEING GROUND
[DSA-AC] In golf, the starting place for the hole to be played....
-
305.2 Floor or Ground Surfaces
Floor or ground surfaces of a clear floor or ground space shall comply with 302. Changes in level are not permitted. EXCEPTION: Slopes not steeper than 1:48 shall be permitted....
-
305.2 Floor or Ground Surfaces
Floor or ground surfaces of a clear floor or ground space shall comply with 302. Changes in level are not permitted. EXCEPTION: Slopes not steeper than 1:48 shall be permitted....
-
305.2 Floor or Ground Surfaces
Floor or ground surfaces of a clear floor or ground space shall comply with 302. Changes in level are not permitted....
-
Transfer Platforms
Transfer Platforms A transfer platform is a platform or landing that an individual who uses a wheelchair or mobility device can use to lift or transfer onto the play structure and leave...
-
11B-1007.3.1 Start of play
A clear floor or ground space 48 inches (1219 mm) minimum by 60 inches (1524 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
11B-1007.3.1 Start of play
A clear floor or ground space 48 inches (1219 mm) minimum by 60 inches (1524 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
11B-1007.3.1 Start of play
A clear floor or ground space 48 inches (1219 mm) minimum by 60 inches (1524 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....