reassignment of services to accessible buildings, assignment of aides to beneficiaries, home visits, delivery of services at alternate accessible sites, alteration of existing facilities and construction...
Search Results "CSI: Construction Specification Institute"
-
1. Program Access
-
a) History and Objectives
Mizner, the Director of MOD, testified that because Hopper was not familiar with construction practices in San Francisco, she felt that he had significantly underestimated both the projected...
-
James L.E. Terry, A.I.A., Principal Trainer
complying with the ADA and in developing database systems for tracking ADA compliance, assisted clients in evaluating their facilities and training personnel, and provided plan reviews for new construction...
-
New Trails [F247.1]
Under the FTDS, a trail has only one designed use that determines the design, construction, and maintenance parameters for the trail....
-
Scenario 8 – Accessibility
Districts are not required to make each existing facility or every part of an existing facility accessible if the facility in question was constructed before June 4, 1977; however, districts...
-
8.1 Q. The Fair Housing Act applies to covered multifamily dwellings built for first occupancy after March 13, 1991. What is acceptable evidence of first occupancy?
The Fair Housing Act regulations provide that covered multifamily dwellings shall be deemed to be designed and constructed for first occupancy on or before March 13, 1991 (and therefore...
-
203.9 Employee Work Areas
Spaces and elements within employee work areas shall only be required to comply with 206.2.8, 207.1, and 215.3 and shall be designed and constructed so that individuals with disabilities...
-
Section 36.406(b) Application of Standards to Fixed Elements (Section-by-Section Analysis)
Once the construction or alteration of a facility has been completed, all other aspects of programs, services, and activities conducted in that facility are subject to the operational requirements...
-
9. Outdoor Developed Areas
the Board’s website: “Achieving accessibility in outdoor environments has long been a source of inquiry due to challenges and constraints posed by terrain, the degree of development, construction...
-
Maintenance
trail tread and access routes, such as filling ruts, reshaping a trail bed, replacing or reshaping surfacing material, repairing washouts, installing riprap to retain cut and fill slopes, constructing...
-
The Purpose of FSORAG and FSTAG
All new construction and alterations for Forest Service outdoor recreation facilities and trails must meet the requirements of FSORAG and FSTAG....
-
Step 1: Determine the Applicability of FSTAG
Does the work meet the definitions for new construction or alteration? Definitions are in "Understanding Trail Terminology" of this guidebook. If yes, 2....
-
4.9.4 HANDRAILS
(4) Gripping surfaces shall be uninterrupted by newel posts, other construction elements, or obstructions....
-
Summary of Costs and Benefits
Access Routes $4,497 to $6,530 to purchase roll-out mats for beach access routes, if parking areas, toilet facilities, bathing facilities, and circulation paths serving beaches are constructed...
-
United States of America v. Hilton Worldwide Inc. - Consent Decree
license agreements with the hotel owners or the agents of the hotel owners of each facility in the HWI system, operating under various trade and service names and marks, failed to design and construct...
-
Free Technical Assistance
www.usdoj.gov/crt/ada/index.html Reference: ADA Standards for Accessible Design (28 CFR Part 36): § 4.1.6 Alterations; § 4.1.2 Accessible Sites and Exterior Facilities: New Construction...
-
9. Outdoor Developed Areas
the Board’s website: “Achieving accessibility in outdoor environments has long been a source of inquiry due to challenges and constraints posed by terrain, the degree of development, construction...
-
11B-302.1 General
Outdoor walking surfaces are often constructed of concrete or asphalt. ...
-
11B-302.1 General
Outdoor walking surfaces are often constructed of concrete or asphalt....
-
9. Outdoor Developed Areas
the Board’s website: “Achieving accessibility in outdoor environments has long been a source of inquiry due to challenges and constraints posed by terrain, the degree of development, construction...
-
F105.2.2 ASME
ASME A17.1-2000 is used by local jurisdictions throughout the United States for the design, construction, installation, operation, inspection, testing, maintenance, alteration, and repair...
-
Public Entrances
Therefore, under the 1991 Standards where two public entrances are planned in a newly constructed facility, both entrances are required to be accessible....
-
221.2.3.2 Vertical Dispersion
ETA Editor's Note: This Access Board Note was taken from 35.151(g) New Construction and Alterations; Assembly Areas and 36.406(f) Standards for New Construction and Alterations; Assembly...
-
Table 2: Summary of Department of Transportation Survey
±3/4" (±19mm) 10 Elevation points of construction 0 1.2 in. 0.33 in....