Have a disaster or fire plan at your home. While high‑rise buildings have built‑in technology and safety features, houses or apartment buildings are often less safe. People are...
Search Results "Evacuation Signage"
Commonly Searched Documents
-
Create an Emergency Plan for Your Home
-
Applying Emergency Planning Strategies
[See subsections ...]
-
Projecting Numbers of Attendees with Disabilities
Every event includes people with disabilities. Some disabilities are visible, others are hidden. Typically, projected numbers of attendees with disabilities are under estimated as...
-
11B-502.6.1 Finish and size
Parking identification signs shall be reflectorized with a minimum area of 70 square inches (45,161 mm2).
-
F216.9 TTYs
Identification and directional signs for public TTYs shall be provided in accordance with F216.9.
-
11B-216.9 TTYs
Identification and directional signs for public TTYs shall be provided in accordance with Section 11B-216.9.Â
-
F216.13 Trailhead Signs
Where new trail information signs are provided at trailheads on newly constructed or altered trails designed for use by hikers or pedestrians, the signs shall comply with...
-
216.9 TTYs
Identification and directional signs for public TTYs shall be provided in accordance with 216.9.
-
At least one public TDD must be provided.
• At least one public TDD (telecommunications device for persons who are deaf or who have speech impairments) must be provided. Signs must identify the location of the TDD and...
-
D. Sign Height
D. Does each accessible parking space have a post- or wall-mounted sign with the symbol of accessibility mounted high enough so the sign is visible when a vehicle is parked in the...
-
216.9 TTYs
216.9 TTYs. Identification and directional signs for public TTYs shall be provided in accordance with 216.9.
-
11B-216.9 TTYs
Identification and directional signs for public TTYs shall be provided in accordance with Section 11B-216.9. ETA Editor's Note The ADA requirements included at Section...
-
11B-703.7.2.6.1 Men’s toilet and bathing facilities
A triangle symbol shall be located at entrances to men’s toilet and bathing facilities. The triangle symbol shall be an equilateral triangle 1/4 inch (6.4 mm) thick with edges 12...
-
11B-703.7.2.6.2 Women’s toilet and bathing facilities
A circle symbol shall be located at entrances to woman’s toilet and bathing facilities. The circle symbol shall be ¼ inch (6.4 mm) thick and 12 inches (305 mm) in diameter. The color...
-
11B-502.6.1 Finish and size
Parking identification signs shall be reflectorized with a minimum area of 70 square inches (45,161 mm2).
-
11B-502.6.1 Finish and size
Parking identification signs shall be reflectorized with a minimum area of 70 square inches (45,161 mm2).
-
11B-216.9 TTYs
Identification and directional signs for public TTYs shall be provided in accordance with Section 11B-216.9.
-
11B-703.7.2.6.1 Men’s toilet and bathing facilities
An equilateral triangle, ¼ inch (6.4 mm) thick with edges 12 inches (305 mm) long and a vertex pointing upward, shall be located at entrances to men’s toilet and bathing facilities....
-
11B-703.7.2.6.2 Women’s toilet and bathing facilities
A circle, ¼ inch (6.4 mm) thick and 12 inches (305 mm) in diameter, shall be located at entrances to women’s toilet and bathing facilities. The circle symbol shall contrast with the...
- Access Board: Tactile Sign Location
-
4.1.7(3)(b)
EXCEPTION: If it is determined that no entrance used by the public can comply with 4.14, then access at any entrance not used by the general public but open (unlocked) with directional signage...
-
Which Paths Are Usable Circulation Paths?
Building management should consider installing appropriate visual, tactile, and/or braille signage in appropriate locations conforming to the code requirements in Annex C....
-
11B-502.8 Additional signage
An additional sign shall be posted either; 1) in a conspicuous place at each entrance to an off-street parking facility or 2) immediately adjacent to on-site accessible parking and...
-
11B-216.11 Check-out aisles
The referenced CBC identification signage requirements are more definitive regarding sign size and placement....