(6) Adding raised markings on elevator control buttons;
Search Results "Architectural Barrier"
Commonly Searched Documents
-
§ 36.304(b)(6)
-
§ 36.304(b)(9)
(9) Installing offset hinges to widen doorways;
-
Sec.36.304(b)(9)
(9) Installing offset hinges to widen doorways;
-
Sec.36.304(b)(6)
(6) Adding raised markings on elevator control buttons;
-
Sec.36.304(b)(18)
(18) Creating designated accessible parking spaces;
-
§ 37.43(e)(2)(iii)
(iii) Costs associated with providing accessible telephones (e.g., relocation of phones to an accessible height, installation of amplification devices or TDDs);
-
i. Barriers to Web accessibility
Individuals who are blind or have low vision often confront significant barriers to Web access....
-
Your ADA Obligations
You must, for instance: Follow accessibility standards when constructing or altering facilities; Remove architectural or structural communication barriers in existing facilities...
-
Sec.36.304(d)(2)
(2) If, as a result of compliance with the alterations requirements specified in paragraph (d)(1) of this section, the measures required to remove a barrier would not be readily achievable...
-
§ 37.5(f)
compliance with the requirements of the rules of the Department of Justice concerning eligibility criteria, making reasonable modifications, providing auxiliary aids and services, and removing barriers...
-
§ 37.5(i)(1) Private entity-private transport
compliance with the requirements of the rules of the Department of Justice concerning eligibility criteria, making reasonable modifications, providing auxiliary aids and services, and removing barriers...
-
ADA Mediation Program - Questions and Answers
Established in 1994, the Department's ADA Mediation Program has achieved remarkable results, eliminating architectural, communication, and attitudinal barriers for thousands of people, while...
-
Typical Day - Public Entities: (State and Local Governmental Entities)
Communication Barriers to people with Visual Impairments (30 - 60 minutes) Communication is a critical responsibility mandated by Title II....
- Sioux Chief DropKick™ Offset Flange 889-45PAM
- Oatey Level Fit Offset Closet Flange Metal Ring 43501 - PVC
- Oatey Level Fit Offset Closet Flange Metal Ring 43804 - PVC Bulk
- Oatey Level Fit Offset Closet Flange Metal Ring 43500 - ABS 15150
- Sioux Chief FullFlush™ Offset Flange 889-AOM
- Zurn Z1209 Vertical Offset Siphon Jet Water Closet Support System
-
6.14.1 Clear Width
Gate openings and openings in barriers for pedestrian passage shall provide a clear width of 36 inches (915 mm), complying with ODAAG, section 1017.3 Clear Tread Width....
-
Technical difficulty and readily achievable
Along with cost and business operation, the technical feasibility of barrier removal must be taken into consideration....