Only those standards approved by the California Building Standards Commission that are effective at the time an application for building permit is submitted shall apply to the plans and...
Search Results "Effective Date"
-
1.1.9 Effective date of this code
-
Appendix to § 35.151(c)
Compliance Date for New Construction of Alterations Applicable Standards Before September 15, 2010 1991 Standards or UFAS On or after September...
-
§27.71(j) Shared-use automated airport kiosks.
(j) Shared-use automated airport kiosks. This paragraph applies to U.S. airports with 10,000 or more annual enplanements.
-
Definitions
“Effective Date” of this Agreement is the date of the last signature below....
-
Definitions
“Effective Date” of this Agreement is the date of the last signature below....
-
Section 36.406(a)(2) Applicable Standards (Section-by-Section Analysis)
The Department is proposing to adopt the proposed standards and to establish the effective date and triggering event for the new coverage. ...
-
3. When Was it Built? Why Does it Matter?
The ADA treats facilities that were built before it went into effect differently from those built or renovated afterwards. ...
-
Before January 26, 1992
Before January 26, 1992 Facilities built before January 26, 1992, are referred to as “pre-ADA” facilities.25 If there is an architectural barrier to accessibility in a pre-ADA...
-
After January 26, 1992
After January 26, 1992 Any facility built or altered after January 26, 1992, must be “readily accessible to and usable by” persons with disabilities.27 For ADA compliance purposes,...
-
Effective Date
“Effective Date” is the date the Consent Decree is approved by the Court....
-
Designed and Constructed for First Occupancy (Preamble, Section-by-Section Analysis)
The Department considered using as a trigger date for application of the accessibility standards the date on which a permit is granted....
-
Section 36.402 Alterations (Preamble, Section-by-Section Analysis)
The Department agrees that the proposed rule would, in some instances, unfairly penalize projects that were substantially completed before the effective date....
-
2.5 Physical Accessibility.
The applicability of the Standards is based on the construction date of the specific structure....
-
Section 36.305 Effective Date (Preamble, Section-by-Section Analysis)
Section 36.305 Effective Date In general, title III is effective 18 months after enactment of the Americans with Disabilities Act, i.e., January 26, 1992....
-
§ 36.401(a) General
(a) General.
-
§ 36.401(a)(2)
(2) For purposes of this section, a facility is designed and constructed for first occupancy after January 26, 1993, only –
-
§ 36.401(a)(2)(i)
(i) If the last application for a building permit or permit extension for the facility is certified to be complete, by a State, County, or local government after January 26, 1992...
-
§ 36.401(a)(2)(ii)
(ii) If the first certificate of occupancy for the facility is issued after January 26, 1993.
-
§ 36.402 Alterations.
-
§ 36.402(a) General.
(a) General.
-
§ 36.402(a)(1)
(1) Any alteration to a place of public accommodation or a commercial facility, after January 26, 1992, shall be made so as to ensure that, to the maximum extent feasible, the...
-
§ 36.402(a)(2)
(2) An alteration is deemed to be undertaken after January 26, 1992, if the physical alteration of the property begins after that date....
-
§ 36.406 Standards for new construction and alterations.
-
§ 36.406(a) Accessibility standards and compliance date.
(a) Accessibility standards and compliance date....