However, the Department believes that an 18-month compliance date gives small movie theaters, especially those struggling financially as a result of the unrelated costs of digital conversion...
Search Results "Cost Impact Analysis"
Commonly Searched Documents
-
F. Measures Taken To Limit Impact on Small Entities
-
7.6. Measures Taken to Limit Impact on Small Entities
However, the Department believes that an 18-month compliance date gives small movie theaters, especially those struggling financially as a result of the unrelated costs of digital conversion...
-
Impact Annenuation [sic]
A 4.5 kg (10 lb.) hemispherical impact head is shown installed over the D surface at a height of 3 meters (10 feet)....
-
1630.15(c)
(c) Other disparate impact charges....
-
Final Regulatory Flexibility Analysis
The Regulatory Flexibility Act requires federal agencies to consider the impacts of their rules on small entities, analyze alternatives that minimize the impacts on small entities, and to...
-
Regulatory Impact Analysis.
An initial regulatory impact analysis of the costs and benefits of a proposed rule is required by Executive Order 12866 (as amended by Executive Order 13258 and Executive Order 13422). ...
-
Additional benefits of water closet clearance standards
Executive Order 12866 refers explicitly not only to monetizable costs and benefits but also to ‘‘distributive impacts’’ and ‘‘equity,’’ see E.O. 12866, section 1(a), and it is important...
-
Additional benefits of water closet clearance standards
Executive Order 12866 refers explicitly not only to monetizable costs and benefits but also to ‘‘distributive impacts'' and ‘‘equity,'' see E.O. 12866, section 1(a), and it is important...
-
Regulatory Flexibility Act: Initial Regulatory Flexibility Analysis
The Regulatory Flexibility Act requires agencies to consider the impacts of their regulatory proposals on small entities, analyze alternatives that minimize the impacts on small entities...
-
Tiles
The cost for TIL ranged from $8.96/sq. ft. to $21/sq. ft. TIL was the most expensive of the five types of surfaces identified for study. ...
-
Significant Issues Raised by Public Comments in Response to the Initial Regulatory Flexibility Analysis
As noted above, we certified that the proposed rule would not have a significant economic impact on a substantial number of small entities....
-
4.2.7. Maintenance and Administrative Costs
The primary analysis assumes annually recurring maintenance and administrative costs equal to 3 percent of equipment acquisition costs. ...
-
5. ADJUSTED CONSTRUCTION COST
ADJUSTED CONSTRUCTION COST...
-
B. Regulatory Flexibility Act—Impact on Small Businesses
Regulatory Flexibility Act—Impact on Small Businesses...
-
Engineered Wood Fiber
The EWF ranged in cost from $ .74/sq. ft. to $2.50/sq. ft. ...
-
Hybrid Surface Systems
All three systems have been purposefully designed and marketed to provide an impact attenuating and accessible surface to accommodate both safety and accessibility. ...
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
Site Profiles by Surface Type
Table 2 provides a profile of each playground, the installation date, total area, surface area, cost for equipment and cost for surfaces. ...
-
6. Regulatory Analyses
and an initial regulatory flexibility analysis of the impacts on small governmental jurisdictions with a population of less than 50,000 when the NPRM was issued....
-
Cost Estimates for Barrier Removal
Basic Costs $0.00 Cost Estimate is expected to be zero. $1.00 Unit Cost Estimate is too dependent on existing conditions to set a generic estimate....
-
E. Cost and benefits of website regulations
Regulatory actions that are deemed to be economically significant must include a formal regulatory analysis––a report analyzing the economic costs and benefits of the regulatory action....
-
3.8 Maintenance and Administrative Costs
The cost estimation also quantifies any additional maintenance and administrative costs associated with the rulemaking. ...
-
Costs to Provide Detectable Warning Surfaces on Curb Ramps (Section-by-Section Analysis)
Costs to Provide Detectable Warning Surfaces on Curb Ramps (Section-by-Section Analysis) Detectable warning surfaces are available in a variety of materials....