The construction shall be all welded, with exposed stainless surfaces polished to a #4 satin finish....
Search Results "New Construction"
- Willoughby Industries HS-1013-46-HC 18" wide Lavatory
-
§35.190 Designated agencies (Section-by-Section Analysis)
The Department has deleted these areas from the lists assigned to the Departments of Education and Housing and Urban Development, respectively, and has added a new paragraph (c) to section...
-
Captioning at sporting venues. (Section-by-Section Analysis)
Other commenters argued for flexibility in the requirements for providing captioning and contended that any requirement should apply only to stadiums constructed after the effective date...
-
Captioning at sporting venues. (Section-by-Section Analysis)
Other commenters argued for flexibility in the requirements for providing captioning and that any requirement should only apply to stadiums constructed after the effective date of the regulation...
- Gateway to Gold Mobile App for U.S. Paralympics
-
Companion Seats
Comments noted that this requirement effectively doubles the scoping requirements for wheelchair spaces and that the required extra space would significantly increase construction costs....
-
(A) Staircase replacements are alterations.
Replacing a staircase is an alteration here because staircases that are demolished, under construction, or otherwise in disrepair in public transportation facilities directly impact usability...
-
What other considerations are significant for persons with disabilities?
However, some natural surfaces, such as compacted earth, soil treated with consolidants, or materials stabilized and retained by permanent or temporary geotextiles, gridforms, or similar construction...
-
Floor Naming and Numbering
It’s meant to be for the mechanical systems and labeling those into the AC systems and [other construction coordination] Comment by [Participant]: It should never be the numbering system...
-
711.4.1 Through penetrations
conditions under a minimum positive pressure differential of 0.01 inch (2.49 Pa) of water at the location of the penetration for the time period equivalent to the fire-resistance rating of the construction...
-
The Roles of the Access Board and the Department of Justice
Originally, the Access Board was established to develop and maintain accessibility guidelines for facilities designed, constructed, altered, or leased with Federal dollars under the Architectural...
-
Hardwired Systems
INDUCTION LOOP INFRARED FM Sources of Signal Interference wiring, computers, transformers, florescent lighting (less with 3-D mat); construction steel can cause erratic...
-
Design Speed
Consequently, it can significantly impact the cost, constructability, and operational safety of a project....
-
15(e)
HWI shall ensure that each Post-1993 Owned Hotel and Post-1993 Joint Venture Hotel constructed for first occupancy after the Consent Decree Date has the required number of rooms, as set...
-
ASME A18.1 Safety Standard [§410.1]
The ASME A18.1 covers the design, construction, installation, operation, inspection, testing, maintenance and repair of lifts that are intended for transportation of persons with disabilities...
-
Applying the Accessibility Standards to the Plan, Installation, and Maintenance of Ground Level Accessible Routes for Playgrounds
Accessibility Standards to the Plan, Installation, and Maintenance of Ground Level Accessible Routes for Playgrounds The following questions can be used through the planning process, during construction...
-
VII. DISPUTE RESOLUTION
The parties hereto agree that any dispute or controversy arising out of, relating to, or in connection with this Agreement, or the interpretation, validity, construction, performance, breach...
-
A. GENERAL NONDISCRIMINATION REQUIREMENTS
Ensuring that facilities for which construction or alteration was begun after January 26, 1992, are readily accessible to and usable by people with disabilities, in accordance with the Title...
-
The Roles of the Access Board and the Department of Justice
Originally, the Access Board was established to develop and maintain accessibility guidelines for facilities designed, constructed, altered, or leased with Federal dollars under the Architectural...
-
233.3.1 Residential Dwelling Units with Mobility Features, F233.3.1 Residential Dwelling Units with Mobility Features, F233.4.1 Residential Dwelling Units with Mobility Features
EXCEPTION: Where facilities contain 15 or fewer residential dwelling units, the requirements of 233.3.1.1 shall apply to the total number of residential dwelling units that are constructed...
-
What is a transition plan? Does every facility need one?
Since the 1968 passage of the Architectural Barriers Act (ABA), newly acquired, constructed, or altered buildings that are owned, rented, or leased by or for a Federal agency have been required...
-
Camp Shelters
Connect camp shelters located on trails to the other constructed features at the site by a trail that meets the technical requirements in FSTAG....
-
Surfaces for Outdoor Recreation Access Routes
The surface of an outdoor recreation access route and the surface surrounding constructed features must be firm and stable. No exceptions are allowed....
-
Section 1193.23 Product design, development and evaluation
At the other end of this spectrum, if there is a highly complex, convergent, or revolutionary new product this may require as much as 37.5 hours of professional evaluation throughout the...