(e) Path of travel.
Search Results "Elevator Door Timing"
-
Sec.36.403(e) Path of travel
-
1010.2 Door operations
...
-
1010.2 Door operations
...
-
Individual Safety Briefings and Timely and Complete Access to Information
Carriers must ensure that, upon request, passengers with a disability, including those who are blind or visually impaired or deaf, hard of hearing, or deaf-blind, have timely access to information...
- TownSteel FME4030 Mortise Lockdown Rigid Trim Security Cylinder
- TownSteel FME4020 Mortise Lockdown Clutched Trim
- TownSteel FME4010 Mortise Lockdown Rigid Trim RFID Mortise
- TownSteel FCE4030 Cylindrical Lockdown Rigid Trim Security Cylinder RFID Cylindrical
-
4.29.3* TACTILE WARNINGS ON DOORS TO HAZARDOUS AREAS
Doors that lead to areas that might prove dangerous to a blind person (for example, doors to loading platforms, boiler rooms, stages, and the like) shall be made identifiable to the touch...
-
You must provide timely enplaning, deplaning, and connecting assistance
You must provide timely enplaning, deplaning, and connecting assistance to passengers with disabilities requesting such assistance....
-
Lavatory & Accessory Layouts
The trash receptacle is preferred to be near the door to allow people to pull the door open with a paper towel and drop it into the receptacle before exiting....
-
Adding an elevator for barrier removal trigger POT upgrades?
Site topography requires removal of barrier by adding an elevator, does this trigger POT upgrades to the area of work? ...
-
CHAPTER 30 ELEVATORS AND CONVEYING SYSTEMS
CHAPTER 30 ELEVATORS AND CONVEYING SYSTEMS ETA Editor's Note This Pocket Guide contains only the excerpts from California Building Code Chapter 30 that are adopted by Division...
-
7(1)(a)
(a) A clear floor space at least 30 inches by 48 inches that allows a parallel approach by a person in a wheelchair is provided at the range or cooktop and sink, and either a...
-
Ground Level Requirements Based on Elevated Play Components
Ground Level Requirements Based on Elevated Play Components The number and variety of ground-level play components required to be on an accessible route is also determined by the number...
-
5.8.2.1 Height of Breast Platform at Time of Measurement
5.8.2.1 Height of Breast Platform at Time of Measurement Recommendation The Committee recommends measuring all knee and toe clearances when the top of the breast platform is set at...
-
Effective date: Time period. (Section-by-Section Analysis)
When the ADA was enacted, the effective dates for various provisions were delayed in order to provide time for covered entities to become familiar with their new obligations. ...
-
11B-206.2.3 Multi-story buildings and facilities
The following types of privately funded multistory buildings do not require a ramp or elevator above and below the first floor: 1.1. ...
-
11B-206.2.3 Multi-story buildings and facilities
The following types of privately funded multistory buildings do not require a ramp or elevator above and below the first floor: 1.1. ...
-
11B-206.2.3 Multi-story buildings and facilities
The following types of privately funded multistory buildings do not require a ramp or elevator above and below the first floor: 1.1 Multi-storied office buildings (other than the...
-
§8.24(d) Transition plan and time period for structural changes
(d) Transition plan and time period for structural changes....
-
11B-804.6.5.2 Bottom-hinged door ovens
Bottom-hinged door ovens shall have the work surface required by Section 11B-804.3 positioned adjacent to one side of the door....
-
11B-804.6.5.2 Bottom-hinged door ovens
Bottom-hinged door ovens shall have the work surface required by Section 11B-804.3 positioned adjacent to one side of the door....
-
11B-804.6.5.2 Bottom-hinged door ovens
Bottom-hinged door ovens shall have the work surface required by Section 11B-804.3 positioned adjacent to one side of the door....