The Architectural and Transportation Barriers Compliance Board (Access Board) has published a pamphlet on Assistive Listening Systems which lists demonstration centers across the country...
Search Results "Compliance Planning"
Commonly Searched Documents
-
B. Assistive Listening Systems
-
1010.1.9.7 Delayed egress locks
For applications listed in Section 1.9.1 regulated by the Division of the State Architect-Access Compliance, see Chapter 11B, Section 11B-404.2.9....
-
11B-810.5.3 Platform and vehicle floor coordination
Access Board's Note to Reader: The Department of Transportation's ADA Standards note permitted alternatives where compliance is not operationally or structurally feasible in light rail...
-
VALUATION THRESHOLD
year and recent years dating back to 2000 are available on the Division of the State Architect web site at: https://www.dgs.ca.gov/DSA/Resources/Page-Content/Resources-List-Folder/Access-Compliance-Reference-Materials...
-
XI. Overview of Americans with Disabilities Act Accessibility Guidelines for New Construction and Alterations
New construction and alterations must be accessible in compliance with the ADA Accessibility Guidelines. ...
-
REPORTING AND ENFORCEMENT
every twelve (12) months thereafter for the term of this Agreement, the Website Accessibility Coordinator shall submit a report in electronic format to the United States detailing Peapod's compliance...
-
Program Accessibility
When full compliance is not technically feasible, the alteration must follow the Standards to the maximum extent feasible....
-
The Department’s Rulemaking History
date of the proposed standards, the triggering event by which the effective date is calculated for new construction, and variations on a safe harbor that would excuse elements built in compliance...
-
Fire Rings, Grills, Fireplaces, and Wood Stoves
However, if a condition for exception in an alteration project at an existing site prohibits full compliance with a specific requirement for clear floor or ground space (surface, slope,...
-
Step 2: Identify the Presence of Limiting Factors
If so, consider constructing the section of trail between the end of the trail and the prominent feature in compliance with the technical accessibility requirements....
-
The Department's Rulemaking History
date of the proposed standards, the triggering event by which the effective date is calculated for new construction, and variations on a safe harbor that would excuse elements built in compliance...
- Glenn Dea
-
General Comments (Preamble, Section-by-Section Analysis)
The Department plans to work toward this goal....
-
Communication Access
Covers what accessibility is all about, what the standards are, and how to design for 508 compliance by exploring the Web based course "Designing Accessible Websites"....
-
General Comments (Section-By-Section Analysis and Response to Comments)
The Department plans to work toward this goal....
- Alertus Alert Beacons®
- TownSteel FME4020 Mortise Lockdown Clutched Trim
- TownSteel MSE-32-II Classroom Intruder with Indicator on Inside Mechanical Mortise
- TownSteel FCE4030 Cylindrical Lockdown Rigid Trim Security Cylinder RFID Cylindrical
- TownSteel FME4010 Mortise Lockdown Rigid Trim RFID Mortise
- TownSteel FME4030 Mortise Lockdown Rigid Trim Security Cylinder
- TownSteel XME9040 Mortise, Clutched Trim Security Cylinder Mortise Keypad
-
Background:
New York City Transit (NYCT) has altered, is in the process of altering, or plans to alter numerous stations on its rapid rail (subway) lines....
-
Effective date: Triggering event. (Section-by-Section Analysis)
This would apply clearly across all types of covered public accommodations, and the Department plans to clarify what constitutes the start of construction based on responses to this NPRM...
