impracticable for altered elements, spaces, or facilities to fully comply with the requirements for new construction, compliance is required to the extent practicable within the scope of the project...
Search Results "Project"
Commonly Searched Documents
-
R202.3.1 Existing Physical Constraints
-
§8.30 Rental rehabilitation program.
in the rental rehabilitation program shall, subject to the priority in 24 CFR 511.10(l) and in accordance with other requirements in 24 CFR part 511, give priority to the selection of projects...
-
E202.3 Federal Contracts
For example, if a contractor is permitted to use money from a contract to acquire a laptop which is used to help create the deliverable for the project, the laptop, itself, is considered...
-
Reach Ranges and Operable Parts
REACH RANGES AND OPERABLE PARTS Forward and side reach 11B-308.2/3 Over projections 11B-308.2.2/3.2...
-
Extensions
Handrail extensions are required on all new ramps but need not project into perpendicular circulation paths in alterations....
-
Reach Ranges and Operable Parts
REACH RANGES AND OPERABLE PARTS Forward and side reach 11B-308.2/3 Over projections 11B-308.2.2/3.2...
-
A4.34.2 MINIMUM REQUIREMENTS
Handicapped people who live in accessible dwelling units of multifamily buildings or housing projects will want to participate in all on-site social activities, including visiting neighbors...
-
This is a great unit but it's not "recessed", it's semi-recessed.
If you place this unit next to the accessible lavatory or other required clear space and don't allow room for the projection, it may interfere with the minimum required clear floor space...
-
11B-802.1.3 Depth
Consideration should be given to the alignment of the wheelchair space and the adjacent companion seat which may require the rear tires of the wheelchair to project behind the back of the...
-
StormPave Permeable Clay Pavers Installation Video
Requires the Registered User plan or above. Login!
- Bradley 12 Gallon Waste Receptacle 344
-
Handrail Requirements
An exception permitted brackets and balusters attached to the bottom of a handrail provided they did not obstruct more than 20% of the handrail length, their horizontal projection was at...
-
Gates and Barriers
Projections of more than 4 inches (100 millimeters) aren't allowed between 27 inches (665 millimeters) and 80 inches (2,030 millimeters) above the trail surface....
- Bradley Center-Pull Towel Dispenser/12 Gallon Waste 236
-
804.2 Clearance
Clearances are measured from the furthest projecting face of all opposing base cabinets, counter tops, appliances, or walls, excluding hardware....
-
Q6: Curb Ramp Installation Work on Separate Contract
Q6: Is the curb ramp installation work required to be a part of the Plans, Specifications and Estimate package for an alteration project or can the curb ramp work be accomplished under a...
-
804.2 Clearance
Clearances are measured from the furthest projecting face of all opposing base cabinets, counter tops, appliances, or walls, excluding hardware....
-
7.2 General Exceptions
The basis for the determination that General Exception 1 or General Exception 2 apply shall be documented and maintained with the records of the construction or alteration project. ...
-
Built-up Curb Ramps [4.7.6]
Built-up curb ramps are permitted where they do not project into vehicular traffic lanes or access aisles at parking spaces and passenger loading zones....
-
Recessed Doors and Gates [§404.2.4.3]
If any obstruction within 18” of the latch side projects more than 8” from the face of a door or gate, maneuvering clearances for a forward approach must be provided....
-
3.1.3. Growth Rate of Auditoriums
As a result, the cost estimation requires projecting the estimated number of auditoriums by venue type into the future. ...
-
StormPave Permeable Clay Pavers Installation Video 2 (Compaction)
Requires the Registered User plan or above. Login!
-
804.2 Clearance
Clearances are measured from the furthest projecting face of all opposing base cabinets, counter tops, appliances, or walls, excluding hardware....