Public entities must ensure that newly constructed buildings and facilities are free of architectural and communication barriers that restrict access or use by individuals with disabilities...
Search Results "Commencement of Construction"
Commonly Searched Documents
-
VII. New Construction and Alterations
- Landscape Forms Inc. Olithas Outdoor Bench
- Landscape Forms Inc. Plexus Bench Collection
- Landscape Forms Inc. Parallel 42 Bench Collection
-
Camping and Picnic Facilities [F244.2.3.1, F244.3, F245.2.5.1, and F244.5.3]
Within camping and picnic units with mobility features (figure 16), at least one of each type of outdoor constructed feature must comply with the applicable technical requirements for the...
-
Picnic Tables
"Recreation Site Layout" explains how the tables in each of these types of recreation sites must be connected to the other major constructed features at the recreation area....
-
11B-202.2 Additions
Each addition to an existing building or facility shall comply with the requirements for new construction and shall comply with 11B-202.4. Advisory 11B-202.2 Additions....
-
Sec.36.401(a)(2)(i)
(i) If the last application for a building permit or permit extension for the facility is certified to be complete, by a State, County, or local government after January 26, 1992...
-
1011.2.4 Openings
Openings in the clear ground space surface shall not allow the passage of a sphere more than 1/2 inch (13 mm) in diameter. Advisory 1011.2.4 Openings. Where possible, drainage...
-
§ 35.151(c) Accessibility standards
(c) Accessibility standards.
-
Requirements to Remember for: Light Rail Projects
[See subsections ...]
-
Public entrances
Sixty percent of all public entrances to the facility must be accessible. If there are only two entrances, both must be accessible. (DOT ADA Standard 206.4.1.)
-
ADA & Level Boarding - Perfromance [sic] Standards on Station-by-Station Basis
49 CFR §37.42(d)(2) DECEMBER 14, 2011
-
§ 36.401(a)(2)(i)
(i) If the last application for a building permit or permit extension for the facility is certified to be complete, by a State, County, or local government after January 26, 1992...
-
1011.2.4 Openings
This section requires openings in the clear ground space such as drainage grates to not allow passage of a sphere more than 1/2 inch in diameter. Where possible, drainage grates...
-
1011.2.4 Openings
Openings in the clear ground space surface shall not allow the passage of a sphere more than 1/2 inch (13 mm) in diameter. Advisory 1011.2.4 Openings. Where possible, drainage...
-
1.1.11 Ramp running slope
1.1.11 Ramp running slope. Measure for overall running slope of ramps by determining elevations at the top and bottom of the ramp at the midpoint of the width of each ramp run and...
-
§ 35.151(c) Accessibility standards and compliance date.
(c) Accessibility standards and compliance date.
-
§ 37.9(c)
(c)
-
§100.205 Design and construction requirements.
[54 FR 3283, Jan. 23, 1989, as amended at 56 FR 11665, Mar. 20, 1991; 73 FR 63616, Oct. 24, 2008]
-
§ 35.151(c)(5) Noncomplying new construction and alterations
(5) Noncomplying new construction and alterations....
-
Supplementary Information:
to persons with disabilities, and established design and construction requirements to make these dwellings readily accessible to and usable by persons with disabilities....
-
Scope of Coverage
The Fair Housing Act requires that covered multifamily dwellings for first occupancy after March 13, 1991 be designed and constructed in accordance with the Act's accessibility requirements...