Number 83 Description Latch Bolt...
Search Results "Barrier Removal Cost"
- Don-Jo Mfg., Inc. Vertical Rod Protector 83
- Architectural Builders Hardware 1811 Vertical Rod Protectors
- Rockwood Manufacturing Vertical Rod Cover BFRC12
- Don-Jo Mfg., Inc. Vertical Rod Protector 85
- Don-Jo Mfg., Inc. Vertical Rod Protector 81
- ElectionSource Voter Accessibility Expansion Door Hinge
- Stanley FBB 269 Heavy Weight Ball Bearing “Swing Clear” Offset Door Hinge
- Rockwood Manufacturing Company BFRC24 Vertical Rod Cover
- McGuire Manufacturing Co., Inc. Retrofit Insulation Kit for P-Trap
- Inclusion Solutions Offset Door Hinge
- Stanley FBB 266 Heavy Weight Ball Bearing “Swing Clear” Offset Door Hinge
- Stanley FBB 268 Heavy Weight Ball Bearing “Swing Clear” Offset Door Hinge
- Cal-Royal Products Swing Clear Hinges
- Stanley FBB 264 Heavy Weight Ball Bearing “Swing Clear” Offset Door Hinge
- Stanley F248 Standard Weight Plain Bearing “Swing Clear” Full Mortise Offset Door Hinge
- Stanley FBB 248 Standard Weight Ball Bearing “Swing Clear” Full Mortise Offset Door Hinge
-
11B-809.9.3 Removable base cabinets
Exception: Removable base cabinets shall be permitted under sinks and work surfaces provided that all of the following conditions are met: a) base cabinets can be removed without the...
-
11B-809.9.3 Removable base cabinets
Exception: Removable base cabinets shall be permitted under sinks and work surfaces provided that all of the following conditions are met: a) base cabinets can be removed without the...
-
Architectural Barriers Act
Architectural Barriers Act ________________________________________________________________ 1968 The Architectural Barriers Act mandates the removal of what is perceived to be...
-
4.2.5. Device Replacement
Under an annual device replacement rate of 15 percent, the replacement costs decrease by 21 percent over the 15-year period of the analysis, and the total costs decrease to $80.8 million...
-
709.3 Fire-resistance rating
A 1-hour fire-resistance rating is required for smoke barriers. Exception: Smoke barriers constructed of minimum 0.10-inch thick (2.5 mm) steel in Group I-3 buildings....
-
11B-202.4 Path of travel requirements in alterations, additions and structural repairs
Alterations solely for the purpose of barrier removal undertaken pursuant to the requirements of the Americans with Disabilities Act (Public Law 101-336, 28 C.F.R., Section 36.304) or the...
-
7. Path of Travel Requirements and Adjusted Construction Cost
Path of Travel Requirements and Adjusted Construction Cost Specific exceptions within the CBC provide that PV system projects are not alterations for purposes of accessibility....
-
208.1.1
208.1.1 The removal of architectural barriers from a parking facility in accordance with 28 C.F.R. Section 36.304 or with Section 553.508, F....