A solid-brass construction is featured to offer unrivaled durability and reliability. Meets ASME A112.18.1 / CSA B125.1, NSF 61 and WaterSense® standards....
Search Results "Construction Site"
- Speakman Commercial Plumbing Products Commander Widespread Lavatory Faucets SC-3004-LD
- Inpro Corporation JointMaster® 316 Series Single Sightline for Carpet Floor Expansion Joint Covers
- Armor-Tile Tactile Systems Detectable Directional System
- Inpro Corporation SignScape® Regulatory Signs
- American Standard Monterrey Bottom-Mount Kitchen Faucet with Tubular Swivel Spout
- Speakman Commercial Plumbing Products Commander® Widespread Lavatory Faucet SC-3044-LD
- Corbin Russwin Inc. ED7000 Series Narrow Stile Crossbar Exit Device
-
III. Results of the Study
This probably includes considerable time away from the computer during which time the survey remained “open” on the user’s site....
-
Physical and Mental Qualification Standards
and Mental Qualification Standards An employer may establish physical or mental qualifications that are necessary to perform specific jobs (for example, jobs in the transportation and construction...
-
Section 36.406(b) Application of Standards to Fixed Elements
Once the construction or alteration of a facility has been completed, all other aspects of programs, services, and activities conducted in that facility are subject to the operational requirements...
-
Visible Alarms in Alterations to Existing Facilities
4.1.3(14) and 4.1.6(1)(b), and sections 202.3 and 215.1 of the 2010 Standards require that when existing elements and spaces of a facility are altered, the alterations must comply with new construction...
-
11B-302.1 General
Outdoor walking surfaces are often constructed of concrete or asphalt. ...
-
103 Equivalent Facilitation
Departure from the explicit technical and scoping requirements of this code for any element voids any otherwise applicable presumption of rebuttable evidence that the element has been constructed...
-
Section 35.151(d) Scope of coverage
Once the construction or alteration of a facility has been completed, all other aspects of programs, services, and activities conducted in that facility are subject to the operational requirements...
-
a) History and Objectives
Mizner, the Director of MOD, testified that because Hopper was not familiar with construction practices in San Francisco, she felt that he had significantly underestimated both the projected...
-
James L.E. Terry, A.I.A., Principal Trainer
complying with the ADA and in developing database systems for tracking ADA compliance, assisted clients in evaluating their facilities and training personnel, and provided plan reviews for new construction...
-
Using the ORAR Exceptions [F202.3, Exception 4 and 1016, Exceptions 1, 2, and 3]
The conditions for exceptions can be used for newly constructed ORARs at viewing areas....
-
New Trails [F247.1]
Under the FTDS, a trail has only one designed use that determines the design, construction, and maintenance parameters for the trail....
-
Scenario 8 – Accessibility
Districts are not required to make each existing facility or every part of an existing facility accessible if the facility in question was constructed before June 4, 1977; however, districts...
-
OTHER SPECIFIC BARRIERS
The barriers listed in Exhibit A require some form of remediation to meet the City's program access obligations, and/or its obligations to perform new construction and/or alterations in...
-
8.1 Q. The Fair Housing Act applies to covered multifamily dwellings built for first occupancy after March 13, 1991. What is acceptable evidence of first occupancy?
The Fair Housing Act regulations provide that covered multifamily dwellings shall be deemed to be designed and constructed for first occupancy on or before March 13, 1991 (and therefore...
-
203.9 Employee Work Areas
Spaces and elements within employee work areas shall only be required to comply with 206.2.8, 207.1, and 215.3 and shall be designed and constructed so that individuals with disabilities...
-
Section 36.406(b) Application of Standards to Fixed Elements (Section-by-Section Analysis)
Once the construction or alteration of a facility has been completed, all other aspects of programs, services, and activities conducted in that facility are subject to the operational requirements...
-
Interacting with People with Physical Disabilities
When giving directions, consider and be specific about distance, weather conditions, and barriers such as stairs, steep hill, ramps, and construction areas....