This step involves looking at FSTAG, sections 7.4.1 through 7.4.8, which contain the technical requirements for trail grade, cross slope, resting interval, surface, clear tread width, passing...
Search Results "Circular Cross Section"
Commonly Searched Documents
-
Step 3: Apply the Accessibility Provisions
-
1.1.2 Walks
Measure walks and other non - ramp pedestrian surfaces for overall running slope and cross slope as well as local running slope and cross slope variations (flatness) in accordance with 1.1.3...
-
C.3.i. - Does Section 508 require contractors to manufacture EIT that meets the applicable Access Board’s technical provisions?
Section 508 requires the government to purchase EIT that meets the applicable technical provisions of the Access Board’s standards, with certain exceptions....
- FTA Circular 4710.1: Americans with Disabilities Act Guidance
-
403.3 Slope
The cross slope of walking surfaces shall not be steeper than 1:48....
-
403.3 Slope
The cross slope of walking surfaces shall not be steeper than 1:48....
-
Standards Applicable Under Section 504 as of March 15, 2012
addition, effective March 15, 2012, because the 1991 Standards will no longer be an applicable standard under the ADA for any new construction and alterations, we are announcing that for Section...
-
403.3 Slope
The cross slope of walking surfaces shall not be steeper than 1:48....
-
2. Business Necessity
Business Necessity "Business necessity" will be interpreted under the ADA as it has been interpreted by the courts under Section 504 of the Rehabilitation Act....
-
1. & 2. Sidewalk Slope
1. ...do the sidewalks have cross slopes (i.e.: slopes tilting side to side) less than 1:50 (critical dimension of ´" or less) [sic] so persons who use wheelchairs can conveniently negotiate...
-
Resting Intervals on Trails
If the resting interval is adjacent to the trail tread, provide a turning space complying with ABAAS section 304.3.2....
-
Amendments to 49 CFR Part 27
This change was made to ensure consistency between requirements under section 504 and the ADA....
-
E202.6.2 Required Documentation
The responsible agency official shall document in writing the basis for determining that conformance to requirements in the Revised 508 Standards constitute an undue burden on the...
-
E202.5.2 Required Documentation
The responsible agency official shall document in writing the basis for determining that conformance to requirements in the 508 Standards constitute an undue burden on the agency, or...
-
Disability Protest
They named it the American Coalition of Citizens with Disabilities (ACCD): it was the first major cross-disability organization....
-
E201.1 Scope
Section 508 of the Rehabilitation Act (29 U.S.C. 794d) applies to federal departments and agencies, including the U.S. Postal Service....
-
§104.1 Purpose.
The purpose of this part is to effectuate section 504 of the Rehabilitation Act of 1973, which is designed to eliminate discrimination on the basis of handicap in any program or activity...
-
4.7.10 Diagonal Curb Ramps
If diagonal curb ramps are provided at marked crossings, the 48 in (1220 mm) clear space shall be within the markings (see Fig. 15(c) and (d))....
-
1.1.5
1.1.5 A maximum design cross slope for accessible exterior pedestrian paving and ramps of 1.5% (1:67 or about 3/16 in. per ft. [15 mm per m]) is recommended....
-
8. Revisions to Exceptions under 508 Standards
We reasoned that, since maintenance spaces or closets are already exempted from accessibility requirements under section F203.6 of the Architectural Barriers Act (ABA) Standards, there was...
-
H. - Applicability
Beginning June 21, 2001, persons with disabilities could file administrative complaints or bring civil actions in Federal court against agencies that fail to comply with the requirements of Section...
-
H.1.i. - Actions covered. What are examples of actions that WILL TRIGGER the Section 508 procurement obligations?
Acquisition of EIT through a contract amendment that falls outside the general scope of a contract awarded prior to June 25th. (This action would constitute a new contract...
-
4.7.10 DIAGONAL CURB RAMPS
If diagonal curb ramps are provided at marked crossings, the 48 in (1220 mm) clear space shall be within the markings (see Fig. 15(c) and (d))....
-
4.3.7 Slope
Nowhere shall the cross slope of an accessible route exceed 1:50....