(3) This process shall be in operation no later than July 13, 2015....
Search Results "Operation (Control)"
-
§ 37.169(a)(3)
-
§ 37.169(a)(3)
(3) This process shall be in operation no later than July 13, 2015....
-
§ 37.213(d)
(d) This paragraph (d) applies to each over the road bus operator....
-
§ 37.215(a)(2)(ii)
(ii) Modify the requirements of §37.189 for large and/or small demand-responsive operators....
-
Chapter 3: Building Blocks
surfaces (302), changes in level (303), wheelchair turning space (304), clear floor or ground space (305), knee and toe clearance (306), protruding objects (307), reach ranges (308), and operable...
-
DISCUSSION
This research shows that there is a great diversity in the operating characteristics of various road and trail user types (figure 46)....
-
1133B.2.5.2
1133B GENERAL ACCESSIBILITY FOR ENTRANCES, EXITS AND PATHS OF TRAVEL 1133B.2 Doors. 1133B.2.5.2 Hand-activated door opening hardware, handles, pulls, latches, locks and other operating...
-
NPRM
The NPRM proposed that, at new or altered platforms in intercity and commuter rail stations, rail operators would have to ensure that passengers with disabilities would be able to board...
-
BACKGROUND
LCG operates under seven brands including: Childtime Learning Centers, Tutor Time Child Care/Learning Centers, The Children’s Courtyard, Montessori Unlimited, La Petite Academy, Everbrook...
-
If the lift manufacturer specifies that wheelchairs must face away from the vehicle when using the lift, are transportation operators required to permit passengers to board facing the vehicle?
Yes. 49 CFR Part 38 specifies that a lift must permit both inboard and outboard facing of wheelchair users. A lift that requires passengers to face a specific direction does not...
-
11B-411.2.1.7.2 Assignment by touch screen hall call console
Alternative operation shall be by one of the following options: 1. Virtual keypad....
-
11B-411.2.1.7.2 Assignment by touch screen hall call console
Alternative operation shall be by one of the following options: 1. Virtual keypad....
-
11B-411.2.1.7.2 Assignment by touch screen hall call console
Alternative operation shall be by one of the following options: Virtual keypad....
-
Geometry Dash Lite – A Rhythm Platformer That Tests Your Reflexes
With its simple one-touch controls and vibrant design, Geometry Dash Lite is easy to pick up but difficult to master, making it appealing to both casual players and dedicated gamers....
-
§382.3 Facility
Facility means a carrier's aircraft and any portion of an airport that a carrier owns, leases, or controls (e.g., structures, roads, walks, parking lots, ticketing areas, baggage drop-off...
-
Facility:
walks, parking lots, and any other real or personal property, normally used by passengers or prospective passengers visiting or using the airport, to the extent that the carrier exercises control...
-
3401.1 Scope
The provisions of this chapter shall control the alteration, repair, addition and change of occupancy of existing structures, including state-regulated structures in accordance with Sections...
-
8.2.3 Apparatus
Signal delivery and data collection were controlled by a personal computer....
-
Curve Rush: A Thrilling Test of Reflexes and Precision
At its core, curve rush game revolves around controlling a moving object that continuously travels along a curved path....
-
Ground Level Play Components: ADA Standard Section 240.2.1
Section 240.2.1 covers scoping requirements in the current ADA Standards for ground level play components.
-
11B-240.2.1 Ground level play components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
11B-240.2.1 Ground level play components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
11B-603.5 Accessories
All operable parts, including coin slots, shall be 40 inches (1016 mm) maximum above the finish floor....
-
11B-603.5 Accessories
All operable parts, including coin slots, shall be 40 inches (1016 mm) maximum above the finish floor....