Features include a transfer shower, water closet length (rim to rear wall) 24 inches maximum, comparable vanity, clothes closet with swinging door, and door connecting to adjacent guest...
Search Results "Elevator Door Timing"
Commonly Searched Documents
-
Plan 6A: 12-Foot Wide Accessible Guest Room
-
10.3.1(1)
(1) Elements such as ramps, elevators or other circulation devices, fare vending or other ticketing areas, and fare collection areas shall be placed to minimize the distance which wheelchair...
- Panda S.11 Aluminum/Wood Clad Lift & Slide System
- LaCantina Contemporary Clad Slider System
- Panda IS.14 Aluminum Wood Clad IMPACT Lift & Slide System
- LaCantina Aluminum Wood Slider System
-
407.2.3.1 Floor Designation
Floor designations complying with 703.2 and 703.4.1 shall be provided on both jambs of elevator hoistway entrances....
- BEA Inc. PBJ Series Jamb Style Push Plates (Push to Open)
- Doorbell Factory Medium Rectangle Stainless Steel Doorbell
- Nana Wall Systems, Inc. Folding Glass Walls SL60
- Rockwood Manufacturing Company 603 Door Guard - Cast Aluminum
-
Clear Floor or Ground Space
The clear floor space is permitted to overlap onto the landing area to provide access to this elevated window activity....
-
11B-407.2.3.1 Floor designation
Floor designations complying with Sections 11B-703.2 and 11B-703.4.1 shall be provided on both jambs of elevator hoistway entrances....
-
11B-407.2.3.1 Floor designation
Floor designations complying with Sections 11B-703.2 and 11B-703.4.1 shall be provided on both jambs of elevator hoistway entrances....
- Panda S.10 All Aluminum Lift & Slide System
- PDQ XGT Series Cylindrical Lock
- Doorbell Factory Round Stainless Steel Doorbell
- Sargent 10 Line Cylindrical Lock
-
11.1 Q. Under the individual building test, how is the second step of the test performed, which involves measuring the slope of the finished grade between the entrance and applicable arrival points?
A. The slope is measured at ground level from the entrance to the top of the pavement of all vehicular and pedestrian arrival points within 50 feet of the planned entrance, or, if...
-
1(2)(a) Site impracticality due to terrain
(a) Site impracticality due to terrain. There are two alternative tests for determining site impracticality due to terrain: the individual building test provided in paragraph (i), or...
-
11B-233.3.1.2.6 Public housing facility site impracticality
The number of adaptable residential dwelling units required in non-elevator building public housing facilities shall be determined in accordance with Chapter 11A, Section 1150A.1....
- Panda TS.87 Thermally Broken Slim Profile Lift & Slide System
- Panda TS.19 Thermally Broken Lift & Slide System
- ElectionSource Voter Accessibility Expansion Door Hinge