[1991 ADAAG] 4.1.2 Accessible Sites and Exterior Facilities: New Construction. ...
Search Results "Future Construction Theaters"
Commonly Searched Documents
-
1129B.3, Item 2
-
(A) Staircase replacements are alterations.
Replacing a staircase is an alteration here because staircases that are demolished, under construction, or otherwise in disrepair in public transportation facilities directly impact usability...
-
Typical Day One - Basic Facilities Requirements
Compliance Strategies (30 - 60 minutes) Strategy suggestions, self-evaluation and transition plans, leases and contracts, barrier removal, alterations, and suggestions for new construction...
-
What materials may satisfy ADAAG requirements?
In new construction and alterations, surface materials must be specified to be slip-resistant....
-
What other considerations are significant for persons with disabilities?
However, some natural surfaces, such as compacted earth, soil treated with consolidants, or materials stabilized and retained by permanent or temporary geotextiles, gridforms, or similar construction...
-
Regulatory Process Matters
The assessment has estimated the benefits and costs of all new and revised requirements as they would apply to newly constructed facilities, altered facilities, and facilities that are removing...
-
Reduced scoping for public accommodations, small facilities, and qualified small businesses. (Section-by-Section Analysis)
Reduced scoping reflects the determination that, while some requirements make sense for alterations and new construction, in the barrier removal context they might not because of the expense...
-
Effect on the certification process of using more than one regulatory scheme at the state or local level to establish accessibility requirements for title III facilities with new design requirements in the proposed standards. (Section-by-Section Analysis)
Many of these will be constructed as components of buildings and facilities regulated by state and local governments through their building codes. ...
-
Floor Naming and Numbering
It’s meant to be for the mechanical systems and labeling those into the AC systems and [other construction coordination] Comment by [Participant]: It should never be the numbering system...
-
711.4.1 Through penetrations
conditions under a minimum positive pressure differential of 0.01 inch (2.49 Pa) of water at the location of the penetration for the time period equivalent to the fire-resistance rating of the construction...
-
Regulatory Process Matters
The assessment has estimated the benefits and costs of all new and revised requirements as they would apply to newly constructed facilities, altered facilities, and facilities that are removing...
-
D) Curb Ramps at Intersections
Whenever a town constructs a new road and sidewalk or alters existing roads and sidewalks, it must install curb ramps....
-
ADA Checklist for Existing Facilities
Checklist Recreational Checklists Some people think that only new construction and alterations need to be accessible and that older facilities are “grandfathered,” but...
-
The Roles of the Access Board and the Department of Justice
Originally, the Access Board was established to develop and maintain accessibility guidelines for facilities designed, constructed, altered, or leased with Federal dollars under the Architectural...
-
Hardwired Systems
INDUCTION LOOP INFRARED FM Sources of Signal Interference wiring, computers, transformers, florescent lighting (less with 3-D mat); construction steel can cause erratic...
-
Audio Induction Loop
Also, construction steel in a building may cause erratic coverage (steel can absorb the magnetic fields, causing fluctuating reception)....
-
Design Speed
Consequently, it can significantly impact the cost, constructability, and operational safety of a project....
-
15(e)
HWI shall ensure that each Post-1993 Owned Hotel and Post-1993 Joint Venture Hotel constructed for first occupancy after the Consent Decree Date has the required number of rooms, as set...
-
ASME A18.1 Safety Standard [§410.1]
The ASME A18.1 covers the design, construction, installation, operation, inspection, testing, maintenance and repair of lifts that are intended for transportation of persons with disabilities...
-
Applying the Accessibility Standards to the Plan, Installation, and Maintenance of Ground Level Accessible Routes for Playgrounds
Accessibility Standards to the Plan, Installation, and Maintenance of Ground Level Accessible Routes for Playgrounds The following questions can be used through the planning process, during construction...
-
VII. DISPUTE RESOLUTION
The parties hereto agree that any dispute or controversy arising out of, relating to, or in connection with this Agreement, or the interpretation, validity, construction, performance, breach...
-
A. GENERAL NONDISCRIMINATION REQUIREMENTS
Ensuring that facilities for which construction or alteration was begun after January 26, 1992, are readily accessible to and usable by people with disabilities, in accordance with the Title...
-
The Roles of the Access Board and the Department of Justice
Originally, the Access Board was established to develop and maintain accessibility guidelines for facilities designed, constructed, altered, or leased with Federal dollars under the Architectural...
-
11B-410.1 General
If a lift does not provide 80 inch (2030 mm) vertical clearance, it cannot be considered part of an accessible route in new construction....