[56 FR 45621, Sept. 6, 1991, as amended at 71 FR 63266, Oct. 30, 2006]
Search Results "New Construction"
-
§ 37.41 Construction of transportation facilities by public entities
-
F203.3 Construction Sites
Structures and sites directly associated with the actual processes of construction, including but not limited to, scaffolding, bridging, materials hoists, materials storage, and construction...
-
203.2 Construction Sites
Structures and sites directly associated with the actual processes of construction, including but not limited to, scaffolding, bridging, materials hoists, materials storage, and construction...
-
Title II Public Entity Facilities Compliance Fact Sheet
New Construction: All new facilities constructed by, on behalf of or for the use of a public entity shall be designed and constructed to be readily accessible to and usable by persons...
-
Alterations Affecting Primary Function Areas—Exception to Section 202.4 of the 2010 Standards
Under HUD’s Section 504 regulation, when accessible dwelling units are newly constructed or where alterations include the provision of accessible dwelling units, the dwelling units must...
-
R201.1 Scope
All newly constructed facilities, altered portions of existing facilities, and elements added to existing facilities for pedestrian circulation and use located in the public right-of-way...
-
Visible Alarms
Section 215.3 of the 2010 Standards provides that where employee work areas in newly constructed facilities have audible alarm coverage they are required to have wiring systems that are...
-
Outdoor Constructed Features Along Trails [F247.5]
When outdoor constructed features, such as benches (figure 11), picnic tables, or trash and recycling receptacles, are provided along a trail, at least 20 percent, but no less than one,...
-
Sec. 12201. Construction. [Section 501]
[See subsections ...]
-
§ 36.401(d)(1)(i)
(i) Professional office of a health care provider means a location where a person or entity regulated by a State to provide professional services related to the physical or mental...
-
Building Accessibility
[See subsections ...]
-
Accessible routes
Accessible routes that coincide with, or are located in the same area, as general circulation paths and elements such as ramps, elevators, and fare vending and collection must be...
-
Station platforms
Station platforms must be coordinated with the vehicle floor height. (DOT ADA Standard 810.5.3.)
-
Sec.36.401(d)(1)(i)
(i) Professional office of a health care provider means a location where a person or entity regulated by a State to provide professional services related to the physical or mental...
-
F247.5 Outdoor Constructed Features
Where outdoor constructed features are provided on trails, other than within facilities specified in F247.4, at least 20 percent, but not less than one, of each type of outdoor constructed...
-
Physical Accessibility
Under Section 504, facilities (such as buildings) that were built or altered on or after June 4, 1977, are referred to as new construction.110 Specific construction and design standards...
-
Outdoor Constructed Features
[See subsections ...]
-
68.10(7) Construction Documents
(7) Construction Documents--Drawings, specifications, addenda, change orders, construction change directives and other supplemental documents prepared for the purpose of regulatory approval...
-
68.10(4) Commencement of Construction
(4) Commencement of Construction--The date of placement of engineering stakes, delivery of lumber or other construction materials to the job site, erection of batter boards, formwork, or...
-
B. Whether the City May Assert an Undue Burden Defense With Respect to New Construction or Alterations Under Title II of the ADA and Section 504 of the Rehabilitation Act
Whether the City May Assert an Undue Burden Defense With Respect to New Construction or Alterations Under Title II of the ADA and Section 504 of the Rehabilitation Act The City's Seventh...
-
PHYSICAL CHANGES TO FACILITIES
Newly Constructed Facilities: In order to ensure that the following spaces and elements in City facilities, for which construction was commenced after January 26, 1992, are readily accessible...
-
68.10(6) Completion of Construction
(6) Completion of Construction--The date when a construction project results in occupancy or the issuance of a certificate of occupancy....
-
206.7 Platform Lifts, F206.7 Platform Lifts
206.7 Platform Lifts F206.7 Platform Lifts These sections specify where platform lifts are permitted as a component of an accessible route in new construction....
-
5. ADJUSTED CONSTRUCTION COST
ADJUSTED CONSTRUCTION COST...