The loading-edge barrier (outer barrier) which functions as a loading ramp when the lift is at ground level, shall be sufficient when raised or closed, or a supplementary system shall be...
Search Results "Rail System"
Commonly Searched Documents
-
§ 38.23(b)(5) Platform barriers
-
§ 38.159(b)(5) Platform barriers
The loading-edge barrier (outer barrier) which functions as a loading ramp when the lift is at ground level, shall be sufficient when raised or closed, or a supplementary system shall be...
- Sunlighten Community Solocarbon® Far Infrared Sauna
- Aurora Doors Sliding Barn Door
- BEA Inc. Jamb Style Door Access PTE (Push To Exit)
-
C101.4 Units of Measurement (Section-by-Section Analysis)
section, which also has a counterpart in the proposed 508 Standards (E101.4), provides that measurements are stated in metric and U.S. customary units and that the values stated in each system...
-
201.3 Temporary and Permanent Structures
buildings or facilities covered by these requirements include, but are not limited to, reviewing stands, temporary classrooms, bleacher areas, stages, platforms and daises, fixed furniture systems...
-
11B-201.3 Temporary and permanent structures
buildings or facilities covered by these requirements include, but are not limited to, reviewing stands, temporary classrooms, bleacher areas, stages, platforms and daises, fixed furniture systems...
-
409.4.7 Emergency Communications
Emergency two-way communication systems shall comply with 409.4.7....
-
409.4.7 Emergency Communications
Emergency two-way communication systems shall comply with 409.4.7....
-
Mariana Figueiro, Ph.D. 24-hr Lighting Schemes for Older Adults and Persons with Low Vision
The Circadian System (slide 2) We talked about the circadian system yesterday. All the rhythms in our body [run on] approximately 24 hour light-dark cycles....
-
Accessible Entrance
If a drop-off exists, then a barrier such as a raised edge or railing must be installed....
-
M305.2.8 Fittings (Section-by-Section Analysis)
Further, this commenter noted that the requirement conflicts with proposed M302.2.3, which allows for temporary obstructions such as armrests, footrests, and side rails that can be repositioned...
-
Door and Gate Hardware
glazed doors without stiles, existing overhead rolling doors or grilles, and similar existing doors or grilles that are designed with locks that are activated only at the top or bottom rail...
-
1.1.3.2, Item 14.5
Public school automatic fire detection, alarm, and sprinkler systems....
-
§100.143(d)(5)
(5) Improving audit and oversight systems to avoid a recurrence of the likely violations....
-
§ 37.105(h)
(h) Restrictions priorities based on trip purpose (if the system is demand responsive)....
-
§ 37.139(e)(1)(iii)
(iii) The entity's system and timetable for processing applications and allowing presumptive eligibility; and...
-
LaCantina Multi-slide Aluminum Wood Sliding Door System Weather Resistant Sill
Requires the Premium User plan or above. (Login or upgrade your account!)
-
LaCantina Contemporary Aluminum Thermally Controlled Door System Weather Resistant Sill (Recessed)
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Inpro Corporation JointMaster® 103 VCT Expansion Joint Systems Floor to Wall
Requires the Premium User plan or above. (Login or upgrade your account!)
-
LaCantina Multi-slide Aluminum Wood Sliding Door System Pocket Door Model
Requires the Premium User plan or above. (Login or upgrade your account!)
-
AD Systems’ Flush Wood Single Slider w-Transom & Sidelite Both Sides
Requires the Premium User plan or above. (Login or upgrade your account!)