Where new trail information signs are provided at trailheads on newly constructed or altered trails designed for use by hikers or pedestrians, the final rule requires the signs to include...
Search Results "Completion of Construction"
Commonly Searched Documents
-
Trailhead Signs
-
F247.1 General
A trail has only one designed use that determines the design, construction, and maintenance parameters for the trail....
-
State and Local Access Codes
Building design and construction, including safety and accessibility, is largely regulated and enforced by states and local jurisdictions....
-
4. Obstructions
for a driver to position the vehicle to avoid obstructions to the passenger's ability to enter or leave the vehicle at a designated stop location, such as parked cars, snow banks, and construction...
-
[A] 101.4.5 Fire prevention
the storage, handling or use of structures, materials or devices; from conditions hazardous to life, property or public welfare in the occupancy of structures or premises; and from the construction...
-
4. Obstructions
for a driver to position the vehicle to avoid obstructions to the passenger's ability to enter or leave the vehicle at a designated stop location, such as parked cars, snow banks, and construction...
-
1.9.1.1.2
Leases per se, unless alterations occur, do not directly “trigger” construction code requirements....
-
PUBLIC HOUSING
[DSA-AC & HCD 1-AC] Housing facilities owned, operated, or constructed by, for or on behalf of a public entity including but not limited to the following: 1....
-
101.4.5 Fire prevention
the storage, handling or use of structures, materials or devices; from conditions hazardous to life, property or public welfare in the occupancy of structures or premises; and from the construction...
-
1.9.1.1.2
Leases per se, unless alterations occur, do not directly “trigger” construction code requirements....
-
Picnic Tables [1011.2 and 1011.4]
If a table is constructed with one solid leg on each end, as opposed to an A-shaped frame or two individual legs on each end of the table that would allow the wheelchair to fit between,...
-
Acceptable Trail Surfacing Requirements
A traditional paving material such as asphalt and concrete may be appropriate, but this type of surface is expensive to construct, requires the use of heavy materials and equipment, and...
-
The ADA and Department of Justice Regulations
access to state and local government services, places of public accommodation, transportation, and other important areas of American life and, in addition, requires newly designed and constructed...
-
Costs
Access Routes $4,497 to $6,530 to purchase roll-out mats for beach access routes, if parking areas, toilet facilities, bathing facilities, and circulation paths serving beaches are constructed...
-
11B-224.7.2 Multi-bedroom housing units with adaptable features
ETA Editor's Note The following Access Board Note was taken from ADA Title II §35.151(f) New Construction and Alterations; Housing at a Place of Education, and ADA Title III §36.406(e...
-
Introduction
Even brand-new buildings designed for complete accessibility can become inaccessible without proper attention....
-
a) Curb Ramp and Sidewalk Transition Plan
. § 35.150(c)) for the completion of any barrier removal necessary for program access." Dkt. 662, 13:15-18. 71....
-
M301.4 Lift Compatibility
either side transfer, desired patient orientation prior to transfer, always being available to the patient, no need to manually move the patient by hand, and the ability to move the lift completely...
-
Adjustable gap protocol
The second subject was 68 years old and had a complete spinal cord injury at level T2, weighted 185 lbs, was 71” tall, had been using a manual wheelchair for 7 years, and used a walker to...
-
Web Accessibility
The public can pay fines, apply for benefits, renew state-issued identification, register for classes at school, file taxes, apply to a social service program and complete many other activities...
-
Step 6 - Develop a Transition Plan
The schedule to get the work completed. The name of the official(s) responsible for the plan's implementation....
-
Overview
However, these direct purchase options have simply been unavailable to many individuals with disabilities because transactions frequently could not be completed....
-
ADA Coordinator, Grievance Procedure, Self-Evaluations, and Transition Plans
50 or more employees were required to develop a transition plan detailing any structural changes that would be undertaken to achieve program access and specifying a time frame for their completion...
-
A. Final Regulatory Assessment (EO 12866)
A complete copy of this final regulatory assessment is available on the Access Board’s website (www.access-board.gov), as well the Federal Government’s online rulemaking portal (www.regulations.gov...