However, construction in compliance with a certified code during the period when a certification of equivalency was effective shall be considered rebuttable evidence of compliance with the...
Search Results "New Construction"
-
§ 36.606(d)
-
11B-1008.4.3 Play tables
Exception: Play tables designed and constructed primarily for children 5 years and younger shall not be required to provide knee clearance where the clear floor or ground space required...
-
§ 36.606(d)
However, construction in compliance with a certified code during the period when a certification of equivalency was effective shall be considered rebuttable evidence of compliance with the...
-
1.1.5 Referenced codes
When this code does not specifically cover any subject related to building design and construction, recognized architectural or engineering practices shall be employed....
-
16(a)(iv)
(iv) Post-1993 Managed Hotels and Post-1993 Franchised Hotels constructed for first occupancy after the Consent Decree Date have the required number of rooms, as set forth in ADA Standards...
-
68.10(16) Issue
mail, deliver, transmit, or otherwise release plans or specifications to an owner, lessee, contractor, subcontractor, or any other person acting for an owner or lessee for the purpose of construction...
-
11B-1008.4.3 Play tables
Exception: Play tables designed and constructed primarily for children 5 years and younger shall not be required to provide knee clearance where the clear floor or ground space required...
-
11B-1008.4.3 Play tables
Exception: Play tables designed and constructed primarily for children 5 years and younger shall not be required to provide knee clearance where the clear floor or ground space required...
-
1008.4.3 Play Tables
EXCEPTION: Play tables designed and constructed primarily for children 5 years and younger shall not be required to provide knee clearance where the clear floor or ground space required...
-
2. Accessibility Technical Standard
The standard will apply to new kiosks installed three years or more after the effective date and will not apply to any kiosks installed prior to that date....
-
221 Assembly Areas
New 221.2.1.3 Other Boxes....
-
Urinal Depth
Comments were evenly divided on this new specification. Response. The Board has retained the minimum depth specification without modification....
-
809.2.6 Weather Alert Systems
Amendatory Language For the reasons stated in the preamble, we amend 36 CFR part 1191 as follows: Adding new section 809.2.6 to read as follows: 809.2.6 Weather Alert Systems....
-
§27.19(b)
., in the case of a solicitation made in the past under which the recipient can order additional new buses after the effective date of this section)....
-
For more information about the ADA
ADA Website www.ADA.gov To receive e-mail notifications when new ADA information is available, visit the ADA Website’s home page and click the link near the top of the middle column...
-
Alterations
This includes replacement of existing pay phones with units of different types, relocating existing pay phones, or installing new pay phones where none had previously been located....
-
Section 35.139 Direct threat. (Section-by-Section Analysis)
These requirements are found in new § 35.139....
-
907.5.2.3 Visible alarms
In other than Group I-2 and I-2.1, visible alarm notification appliances are not required in alterations, except where an existing fire alarm system is upgraded or replaced, or a new fire...
-
[F] 907.5.2.3 Visible alarms
In other than Group I-2 and I-2.1, visible alarm notification appliances are not required in alterations, except where an existing fire alarm system is upgraded or replaced, or a new...
-
11B-206.2.19 Pedestrian street crossings
ETA Editor's Note The scoping requirement for pedestrian street crossings is new in CBC 2019....
-
Geometry Dash World – A Rhythm-Based Arcade Adventure
In addition to the main levels, Geometry Dash World offers extra content such as daily challenges and unlockable rewards, including new icons and colors for customization....
-
KMA - Associate, Multi-Family Housing
The Associate will independently perform plan reviews of design documents, perform construction site audits, generate written reports, and communicate with design and construction teams...