Section 404.2.3 covers the current ADA Standards for clear width at manual doors, doorways and manual gates that are part of an accessible route.
Search Results "Project Management"
-
Clear Width: ADA Standard Section 404.2.3
-
11B-404.2.3 Clear width
There shall be no projections into the required clear opening width lower than 34 inches (864 mm) above the finish floor or ground....
-
11B-404.2.3 Clear width
There shall be no projections into the required clear opening width lower than 34 inches (864 mm) above the finish floor or ground....
-
1.1.3 Scope
The California Building Code (CBC) accessibility provisions are applicable to new construction projects as well as alterations (as defined) of existing buildings and facilities....
-
1. WORKING WITH VOLUNTEERS
Follow these best practices for organizing volunteers: Assign team leaders who have experience managing volunteers. Have defined tasks....
-
11B-504.5 Nosings
Nosings that project beyond risers shall have the underside of the leading edge curved or beveled....
-
11B-504.5 Nosings
Nosings that project beyond risers shall have the underside of the leading edge curved or beveled....
-
Trail Type
This management concept allows managers to identify trail-specific Design Parameters or technical specifications, management needs, and the cost of managing the trail for particular uses...
-
DORMITORY
where group sleeping accommodations are provided in one room, or in a series of closely associated rooms, for persons not members of the same family group, under joint occupancy and single management...
-
DORMITORY
where group sleeping accommodations are provided in one room, or in a series of closely associated rooms, for persons not members of the same family group, under joint occupancy and single management...
-
DOT Memorandum: INFORMATION: Snow Removal on Sidewalks Constructed with Federal Funding
Administration MEMORANDUM Subject: INFORMATION: Snow Removal on Sidewalks Constructed with Federal Funding Date: August 27, 2008 From: Butch Wlaschin Director, Office of Asset Management...
- Mockett DH2A/BB-SSS Curved Door Handle Back to back Small
-
APPENDIX A: Federal Trail Data Standards (FTDS) – Trail Fundamentals
11/08/2011 Trail Type ◼ Trail Class ◼ Managed Use ◼ Designed Use The Federal Trail Fundamentals include four concepts that are the cornerstones of effective trail planning...
-
11B-812.4 Vertical clearance
Where provided, overhead cable management systems shall not obstruct required vertical clearance....
-
11B-812.4 Vertical clearance
Where provided, overhead cable management systems shall not obstruct required vertical clearance....
-
Shopping Center/Mall
building housing five or more sales or rental establishments; or (B) A series of buildings on a common site, either under common ownership or common control or developed either as one project...
-
SHOPPING CENTER (OR SHOPPING MALL)
on a common site, connected by a common pedestrian access route on, above or below the ground floor, that is either under common ownership or common control or developed either as one project...
-
SHOPPING CENTER (OR SHOPPING MALL)
on a common site, connected by a common pedestrian access route on, above or below the ground floor, that is either under common ownership or common control or developed either as one project...
-
2. New Construction and Alterations
Since June 22, 1998, the City has required that all projects involving new construction or alterations of a building funded, in whole or in part, by the City, undergo review by City staff...
-
Overview
A number of contributing circumstances contributed to the need for a change in the scope of work for this project....
-
Designed Use
There is only one Designed Use per trail or trail segment.Although a trail or trail segment may have more than one Managed Use and numerous uses may be allowed, only one Managed Use is identified...
-
16(a)
(a) After the Effective Date and continuing during the term of this Consent Decree ( i.e. the four years after the Effective Date), when (1) entering into a new franchise or management...
-
A4.8.2 SLOPE AND RISE
The ability to manage an incline is related to both its slope and its length....
-
1.2.3
Within 10 days of the project completion, a DSA-certified project inspector shall sign and submit a verified report to DSA indicating that the completed project is in conformance with the...