INTRODUCTION This document presents uniform standards for the design, construction and alteration of buildings so that physically handicapped persons will have ready access to and use...
Search Results "Temporary Accessible Parking"
-
INTRODUCTION
- ZoomText Web Accessibility 101 Informational Video for the Visually Challenged
- What It's Like to Navigate Chicago in a Wheelchair - Rolling On, Episode 1
-
Web Accessibility 101: Effective Color Contrast
Requires the Registered User plan or above. Login!
-
Keep Good Notes
If there isn’t an accessible entrance you’ll want to indicate how many steps there are and how much space is available to install a ramp or lift....
- Ascension Virtuoso 5460F Vertical Permanently-Installed Wheelchair Lift
-
II. Definitions of Standards and Guidelines Referenced in This Document
Guidelines means the minimum accessibility guidelines published by the United States Access Board in 2004 for both the ADA and the Architectural Barriers Act (ABA).1 2004 ADAAG means...
-
11B-206.2.10 Recreational boating facilities
Boat slips required to comply with Section 11B-235.2 and boarding piers at boat launch ramps required to comply with Section 11B-235.3 shall be on an accessible route....
-
11B-206.2.10 Recreational boating facilities
Boat slips required to comply with Section 11B-235.2 and boarding piers at boat launch ramps required to comply with Section 11B-235.3 shall be on an accessible route....
-
1009.6.5 Two-way communication
Areas of refuge shall be provided with a two-way communication system complying with Sections 1009.8.1 and 1009.8.2.
-
1009.6.5 Two-way communication
Areas of refuge shall be provided with a two-way communication system complying with Sections 1009.8.1 and 1009.8.2.
-
1009.8.1.1 Visible communication method
[DSA-AC and HCD 1-AC] A button complying with Section 1138A.4 or Sections 11B-205 and 11B-309 in the area of refuge shall activate both a light in the area of refuge indicating that...
-
11B-604.8.1.4 Toe clearance
At least one side partition shall provide a toe clearance of 9 inches (229 mm) minimum above the finish floor and 6 inches (152 mm) deep minimum beyond the compartment-side face of...
-
11B-809.7.2 Changes in level
Changes in level shall comply with Sections 11B-303.2 and 11B-303.3. Ramps complying with Section 11B-405, elevators complying with Section 11B-407 or platform lifts complying with...
-
11B-604.8.1.4 Toe clearance
At least one side partition shall provide a toe clearance of 9 inches (229 mm) minimum above the finish floor and 6 inches (152 mm) deep minimum beyond the compartment-side face of...
-
11B-809.7.2 Changes in level
Changes in level shall comply with Sections 11B-303.2 and 11B-303.3. Ramps complying with Section 11B-405, elevators complying with Section 11B-407 or platform lifts complying with...
-
1009.8.1.1 Visible communication method
[DSA-AC and HCD 1-AC] A button complying with Section 1138A.4 or Sections 11B-205 and 11B-309 in the area of refuge shall activate both a light in the area of refuge indicating that...
- Wetland Trail Design and Construction
- Access Board: Door Thresholds
- Access Board: Passing Spaces
- Access Board: Changes in Level
-
11B-207 ACCESSIBLE MEANS OF EGRESS
[See subsections ...]
-
11B-207 Accessible means of egress.
[See subsections ...]
-
11B-207 Accessible means of egress
[See subsections ...]
