Back set 5" Material Brass Size 2-3/4" x 4-1/2" Shelf pack 1 Features UL Listed, Works with 1-3/4" doors, Lever projection...
Search Results "Multifamily Housing Project (HUD 504)"
Commonly Searched Documents
- Don-Jo Mfg., Inc. 5" Hospital Latch 4550
-
B. Public Comments Regarding the Effects of the Rule on Small Movie Theaters
Small Movie Theater Revenues and Available Resources To Comply One commenter reported that at least one segment of the movie exhibition industry, art house cinemas, generally receive...
-
7.2. Public Comments Regarding the Effects of the Rule on Small Movie Theaters
Small Movie Theater Revenues and Available Resources to Comply One commenter reported that at least one segment of the movie exhibition industry, art house cinemas, generally receive less...
-
Compliance date
Many of these commenters argued that the 18-month period was necessary to minimize the likelihood of having to redesign projects already in the design and permitting stages at the time that...
-
B. Agreement of the Parties
The terms of this order shall apply to assembly area projects in the United States, with fixed seating that seats four or more people, for which Ellerbe provides design services after the...
-
Compliance date. (Section-by-Section Analysis)
Many of these commenters argued that the 18-month period was necessary to minimize the likelihood of having to redesign projects already in the design and permitting stages at the time that...
- AJW Architectural Products U1511EA Series Automatic ADA Compliant Hand Dryer, Universal Voltage - Surface Mounted
- Behavioral Safety Products #DH510 Mortise Ligature Resistant Integrated Door Lever
- Stanley Hardware RP9401 Door Closer
- Wikk AccessAbility ™ “Long Ranger” 868 Mhz Transmitters and Receivers
- Falcon Waterfree Technologies Vitreous China Urinal F-4000
-
11B-202 Existing buildings and facilities
Applicants may file a request for unreasonable hardship (see definition and application under Section 202) if the cost of upgrading all the elements listed above exceeds 20 percent of the project...
-
Effective date: Triggering event. (Section-by-Section Analysis)
Some commenters noted that permitting requirements for construction projects covered by title III vary across both states and localities. ...
-
ADA Facilities Compliance Strategies for Private Hospitals
REVIEW - Study all construction and remodeling projects in progress to minimize future problems with “readily achievable” barrier removal and/or failure to meet the “readily accessible”...
-
ADA Facilities Compliance Strategies for Private Entities
REVIEW - Study all construction and remodeling projects in progress to minimize future problems with “readily achievable” barrier removal and/or failure to meet the “readily accessible”...
-
Overview
Appendix A includes references from the field, Appendix B includes an example of a State law that addresses equal opportunity to access PE and athletics, and Appendix C lists projects and...
-
c) Changes
Since many building projects require more than one year to complete, it is not unusual for the pertinent Building Code requirements to change during construction. ...
-
Getting From Here to There—Outdoor Recreation Access Routes
However, if the ground under the element isn't changed as part of that renovation or replacement project, this work doesn't trigger the requirement for outdoor recreation access routes....
-
Changes
Since many building projects require more than one year to complete, it is not unusual for the pertinent Building Code requirements to change during construction. ...
-
Resources
information and advice to employers and people with disabilities on reasonable accommodation in the workplace: 800-526-7234 (Voice); 877-781-9403 (TTY); www.askjan.org The Department of Housing...
-
BACKGROUND
UPDC held a detainee with human immunodeficiency virus (HIV) in isolated, segregated housing for approximately six months because he has HIV....
-
Cassette Recordings (Advisory Guidance)
Audio materials can be produced commercially or in-house....
- AgrAbility - Arthritis Foundation, Indiana Chapter
-
New Construction and Alterations
If the last or final building permit application for a new construction or alterations project is certified before March 15, 2012, businesses may comply with either the 1991 or the 2010...