ILLUSTRATION 1: A public entity is designing and constructing a playground....
Search Results "Capital Construction Cost"
-
II-6.2100 General.
-
Section 4.1.1, Application (Preamble, Section-by-Section Analysis)
Section 4.1.1, Application, provides that all areas of newly designed or newly constructed buildings and facilities and altered portions of existing buildings and facilities required to...
-
B. PUBLIC RIGHT-OF-WAY
DPW's Disability Access Coordinator is responsible for monitoring access issues related to the public right-of-way; reviewing publicly-funded construction projects designed by or contracted...
-
d) Paving Guidelines
Guidelines permit the City to defer curb ramp installation for a period of up to twenty-four months in cases where there is a pre-planned project that would require demolition of the newly constructed...
-
Built Environment Image Guide
The goal of BEIG is to influence the design, construction, and maintenance of buildings and other constructed features so they will: Fit on the land Reflect sensitive site...
-
Permanently Fixed vs. Portable TTYs
In new construction, TTY equipment can be provided as part of the pay phone contract with a phone company, independent pay phone provider, or route subcontractor....
-
6.1 General
The basis for the determination shall be documented and maintained with the records of the construction or alteration project. Exception 2....
-
A. Title III of the ADA and its Implementing Regulations
Discrimination includes a failure to design or construct facilities, or make alterations to the maximum extent feasible, that are “readily accessible to and usable by individuals with disabilities...
-
Section 4.1.1, Application (Section-By-Section Analysis and Response to Comments)
Section 4.1.1, Application, provides that all areas of newly designed or newly constructed buildings and facilities and altered portions of existing buildings and facilities required to...
-
II-5.3000 Curb ramps
To promote both efficiency and accessibility, public entities may choose to construct curb ramps at every point where a pedestrian walkway intersects a curb....
-
PUBLIC HOUSING
[DSA-AC] Housing facilities constructed or altered by, for, or on behalf of a public entity, or constructed or altered as part of a public entity’s program to provide housing pursuant to...
-
224.1 General
Residential dwelling units that are designed, constructed, and utilized exclusively for residential use are not subject to the transient lodging standards. 2....
- Bradley Aerix Hand Dryer Adjustable Speed Universal Voltage 2902-28
- Bradley 1-Station Verge Lavatory System LVGD1
- Bradley 2-Station Verge Lavatory System LVGD2
- Bradley 3-Station Verge Lavatory System LVGD3
- Bradley Aerix Hand Dryer Adjustable Speed Universal Voltage 2902
- Allied Industries International, Inc. Eco-Grip® Slip Resistant Safety Flooring
- Hollaender Manufacturing Company ADA Railing Systems
- Bradley Aerix Hand Dryer Adjustable Speed Universal Voltage Stainless Steel 2902
-
Section 36.102 Application (Preamble, Section-by-Section Analysis)
Similarly, § 36.102(b)(3) provides that the new construction and alterations requirements of subpart D obligate a public accommodation only with respect to facilities used as, or designed...
-
Platform Lifts
In new construction, platform lifts are permitted as a means of vertical access to certain spaces, including performance areas and speakers’ platforms (206.7.1), wheelchair spaces in assembly...
-
206.2.1 Site Arrival Points
way, or a portion of a vehicular way, is provided for pedestrian travel, such as within a shopping center or shopping mall parking lot, this exception does not apply. 35.151(i) New Construction...
-
2.2(c) Regarded as Substantially Limited
It applies to decisions based on unsubstantiated concerns about productivity, safety, insurance, liability, attendance, costs of accommodation, accessibility, workers' compensation costs...